Industrial site planning is about more than counting vacant acres. A site must have the size, configuration, services and transportation access that a prospective employer needs. Springfield, Oregon’s Commercial and Industrial Buildable Lands Inventory and Economic Opportunities Analysis examined these issues for its 2010–2030 planning period. Although the analysis is a municipal land-use study, its findings offer a useful framework for understanding why industrial land availability depends on the characteristics of sites, not simply the total area designated for employment.
Why total industrial acreage can be misleading
A buildable lands inventory identifies land that may accommodate employment growth. But the inventory total does not show whether the available parcels match the needs of businesses seeking to locate or expand. A collection of small lots, for example, does not automatically provide the equivalent of a single large, contiguous site. Combining parcels can be difficult when ownership is divided, owners are unwilling to sell, or the cost of assembly makes development impractical.
Springfield’s analysis found that roughly two-thirds of land designated for employment within its urban growth boundary was already developed and not expected to redevelop during the planning period. Less than 15% of the designated land was considered buildable and unconstrained. The city had only one buildable site of 20 acres or more, despite projected demand for large sites. These findings illustrate why decision-makers and site selectors need to assess parcel size, constraints and redevelopment potential alongside headline acreage.
Industrial site planning must match land to operational needs
The analysis considered the kinds of sites that target industries might require. Potential employers included manufacturers in areas such as food processing, electronics, medical equipment, recreational equipment and wood products, as well as specialty food processors and high-technology firms. Their requirements varied, but the report identified several recurring site characteristics:
- Site area: Manufacturing employers considering locations in Oregon or the Eugene–Springfield area had site needs ranging from 10 acres to more than 100 acres. As an illustration, the report estimated that a 100,000-square-foot building could require a 9-to-12-acre site, while a 500,000-square-foot building could require 45 to 60 acres.
- Topography: The analysis identified slopes of 5% or less for manufacturing sites and up to 7% for high-tech and campus manufacturing.
- Transportation: Sites were expected to be within 15 miles of Interstate 5 or a principal arterial designated as a freight route. The report noted that businesses in Springfield typically located closer to I-5 or a state highway.
- Utilities: Industrial sites needed access to municipal water and wastewater service, with pipeline sizes varying by target industry. The report cited a minimum range of 8 to 10 inches.
These criteria make clear that “available” land is not necessarily suitable land. Evaluating a site means considering whether its physical layout and public services can support the intended use, as well as whether transportation connections align with freight and business requirements.
Large employment sites were the key supply gap
For the 2010–2030 period, Springfield projected that 46% of new employment would not require vacant employment land. The analysis attributed this growth to employment in non-employment designations, existing built space and potentially redevelopable sites. The remaining demand still included large-site requirements that could not be met within the existing urban growth boundary.
After assuming that needs for sites smaller than five acres would be accommodated through redevelopment, the study identified a need for approximately two industrial sites, together requiring about 126 acres. It also identified five commercial and mixed-use sites requiring about 97 acres. The industrial requirement was concentrated in sites 20 acres and larger. This distinction matters: a surplus of small parcels cannot necessarily compensate for a shortage of large sites when the prospective use requires a substantial, unified property.
Redevelopment is part of capacity, not a substitute for every site
Springfield’s strategy included encouraging infill and redevelopment, especially in Downtown and Glenwood. In the analysis, redevelopment meant increasing employment capacity on a site—not merely replacing an old building with a newer one. The plan expected many smaller site needs to be met this way and identified locations where strategic investments could support redevelopment.
However, redevelopment depends on more than zoning or a theoretical estimate of capacity. The report pointed to infrastructure investment and parcel assembly as considerations in targeted areas. It also noted that a land inventory does not, by itself, establish whether an owner is ready to sell or whether a site’s specific characteristics meet a business’s needs. For industrial planning, these distinctions separate long-range land capacity from a site that can realistically serve an employer.
Practical considerations for industrial decision-makers
Springfield’s experience suggests a useful sequence for evaluating employment land:
- Start with the intended operation. Define the likely building and site scale, topography needs, utility access and transportation requirements.
- Check parcel configuration and ownership. Confirm whether the required area is available as one site or depends on assembly across multiple properties.
- Distinguish vacant land from redevelopment capacity. Redevelopment may add employment capacity, but it should not be assumed to meet every large-site requirement.
- Test infrastructure and access. Consider whether municipal services and freight-route connections align with the proposed use.
- Compare supply with demand by site type. Total acreage can obscure shortages in particular size categories or configurations.
Conclusion
Springfield’s economic opportunities analysis shows why industrial site planning requires a detailed view of land supply. Parcel size, terrain, utilities, transportation access, ownership and redevelopment potential all influence whether land can accommodate employment growth. For plant managers, integrators and industrial decision-makers assessing future locations or expansions, the practical lesson is to evaluate sites against operational requirements early—and to distinguish land that is designated for employment from land that is genuinely suited to a specific use.