A new site infrastructure contract can shape how communications networks are built into a development, from initial site registration through construction and inspection to handover. For developers, contractors and project teams, the agreement is more than a commercial document: it defines who supplies materials, who completes civil infrastructure, how work is checked and what must be in place before the network is ready for service.

BT’s 2018 single-site contract for new developments provides a useful example of this project structure. It covers the provision of BT network infrastructure at a site and divides the work between the developer and BT, operating through Openreach. The document is specific to its parties and version; teams should check the applicable contract and current guidance before relying on any terms.

How a new site infrastructure contract divides the work

The contract describes an Infrastructure Service that combines Developer Works and BT Works. In broad terms, the developer installs the site’s relevant civil infrastructure using materials supplied by BT. That work can include ducts, chambers, cable or tube, and draw rope, following the agreed specification. BT is responsible for its associated works, including inspection and installation of BT equipment.

This division makes coordination essential. The developer must complete the infrastructure to the agreed standard and prepare suitable locations and conditions for BT equipment at premises. BT, in turn, is to carry out its works with reasonable skill and care and follow applicable site access, safety and security requirements. The agreement also states that BT will use reasonable endeavours to connect communications services by the first occupancy date, while clarifying that dates are estimates and that retail services are outside the contract’s scope.

Planning, registration and project information

Site registration establishes the development covered by the agreement. The contract refers to site details, registration information, layout plans, network design documents and a bill of materials. Together, these define where infrastructure is to be installed and the intended routes and equipment locations.

Accurate, timely project information supports the handoffs between construction and network delivery. The developer is responsible for providing accurate site address information no later than 10 working days before first occupancy, and for updating BT if those details change. The contract warns that errors or delays in address information may delay service provision.

For project teams, the practical implication is to include telecoms infrastructure in the development schedule rather than treating it as a late-stage utility task. Confirm the site registration details, review the specification and identify material delivery needs early. The contract asks developers, where possible, to give 20 working days’ notice of upcoming material requirements. Larger developments may receive materials in phases.

Construction quality, safety and access

Developer Works must be completed in a proper and workmanlike manner and meet the specification and standards in the Developers’ Handbook. The developer is also required to keep progress records available for inspection. BT issues a Quality Certificate when all or an applicable part of the Developer Works has been completed to the required standard. This certificate marks the handover milestone used in several parts of the agreement.

Safety responsibilities apply to each party’s own work. BT is required to assess risks relating to BT Works and provide a site-specific method statement before starting. The developer must provide a suitable and safe working environment and reasonable access to the site or premises when required. Both sides must follow relevant laws and regulations, site instructions and reasonable health and safety requirements.

The contract specifically calls for checks for buried or other services, including electricity cables, gas and water pipes, electronic communications infrastructure, hazardous gases in underground networks and high-pressure pipelines. It also requires the developer, for Developer Works, to comply with the New Road and Street Works Act 1991 as though it were the undertaker, including applicable codes and reinstatement requirements. These provisions make coordination with other site contractors and utility work a key part of safe delivery.

Materials, warranties and commercial controls

Materials supplied by BT remain BT’s property. Until the Quality Certificate is issued, the developer is responsible for keeping them secure and in good condition, storing them appropriately and using them only for the Developer Works. Any defects in supplied materials should be reported within 20 working days of receipt. Unused materials may be collected by BT at its cost, while disposal or transfer to another development is handled by the developer under the stated process.

After certification, the developer’s warranty obligations cover defects in the Developer Works and conformance with specifications, standards, regulations, drawings and instructions. The contract specifies a 10-year warranty for jointing chamber structures and five years for installed duct. Where no other warranty or guarantee period applies, it states a two-year period. Defective work arising from faulty materials, workmanship or performance standards must be remedied at the developer’s expense, with BT choosing repair, replacement or reconstruction.

Commercial terms include a developer contribution charge where listed in the site registration form, as well as potential time-related, abortive visit and supplementary charges. BT’s applicable price list governs charges, which may change. The agreement also sets out conditions for eligible Service on Demand and self-install payments. For Service on Demand claims, the developer must generally invoice within 12 months of the Quality Certificate; invoice details and payment timing requirements also apply.

Managing handover and delivery risk

Before construction begins, project leads can use the contract structure to build a practical control list:

  • Confirm the site registration, site layout plans and current specification.
  • Schedule material requests and agree storage and handling arrangements.
  • Coordinate duct and chamber installation with other civil works and utility checks.
  • Maintain progress and rework records, and resolve inspection findings before requesting certification.
  • Verify address data, invoice requirements and any applicable charges or payment deadlines.

The agreement also includes provisions on insurance, confidentiality, liability, dispute escalation and changes to guidance. These are not substitutes for project controls, but they define important boundaries for how the parties manage delivery and resolve issues.

Conclusion

A new site infrastructure contract links civil construction, network installation, safety and commercial milestones. Its practical value lies in making responsibilities and handoffs explicit: the developer delivers compliant site infrastructure and manages supplied materials, while BT undertakes its network works and inspection processes. Engineering and operations teams that align schedules, records, access, safety checks and quality inspections with these obligations are better positioned to manage the infrastructure handover and reduce avoidable delivery delays.