A modular multilevel converter (MMC) offers a way to connect high-power wind turbines to the grid while managing voltage levels through a series of smaller power-electronic modules. A Flensburg University research project tested this approach with a 350 kVA medium-voltage demonstrator, focusing on its modular hardware, decentralized control and operation at full voltage. The work is relevant to engineers and operators assessing converter architectures for larger wind energy systems, where grid requirements and equipment scale both matter.

Why consider an MMC for wind power?

Wind turbine generators produce voltage and frequency that vary with operating conditions. The converter must interface this output with a utility grid whose voltage and frequency are comparatively stable, while also meeting grid-connection requirements. These can include remaining connected during voltage dips and, increasingly, during overvoltage events. Converter control can also support grid stability by adjusting reactive power injection in response to voltage changes.

Conventional medium-voltage converters commonly use high-voltage IGBTs or IGCTs, which switch at lower frequencies than lower-voltage devices. Lower switching frequency can increase the filtering challenge. At the same time, low-voltage equipment at multi-megawatt scale involves high currents: the report illustrates the issue with a 5 MW generator, for which phase current is more than 4,000 A at 690 V, compared with about 1,000 A at 3,000 V.

An MMC builds its output from multiple voltage steps rather than relying on a single large voltage transition. In the project’s approach, each submodule uses an IGBT half-bridge and its own capacitor bank. Combining the submodules creates a stepped output voltage and distributes voltage stress among multiple devices. The topology can therefore use lower-voltage IGBTs in a medium-voltage converter. Its stepped waveform can also reduce harmonic content and the associated filtering requirement; the extent of that benefit needs to be assessed for the specific converter and application.

Decentralized control and EtherCAT

Conventional MMC control can place the main calculations in a central controller, connected to individual switching cells by separate fiber-optic links. As the number of cells grows, that arrangement can increase the central controller’s processing and interface demands, as well as the cabling effort.

The demonstrator instead equipped each double submodule with a local FPGA-based controller. The local logic generated pulse-width-modulated switching signals, collected measurements and handled protective responses to conditions such as overcurrent or overvoltage. A central industrial PC running TwinCAT acted as the EtherCAT master, while each module controller operated as a slave. Because the selected FPGA boards did not provide the required optical-fiber interfaces, the project developed and tested a dedicated communications board.

Fiber-optic links connected the controllers in a ring structure. EtherCAT was selected for its short communication cycles and synchronization capabilities. The system operated with a 5 kHz bus sampling rate, while local carrier signals for modulation ran at 1 kHz. EtherCAT Distributed Clocks aligned the distributed controllers; testing confirmed synchronization-event jitter of about 20 ns. The project also measured communication and execution delays to inform timing decisions across the controller and network.

For modulation, the team implemented phase-shifted carrier pulse-width modulation (PSC-PWM). The relative phase of the upper- and lower-arm carrier signals determines how voltage steps and harmonics are distributed. The selected arrangement can produce up to 13 voltage levels in the demonstrated configuration. Local generation of PWM signals and the potential to place capacitor-voltage balancing functions in the module controllers can also reduce the amount of work assigned to the central controller.

Building and validating the demonstrator

The three-phase demonstrator was designed for 350 kVA, a 3 kV line-to-line output and a 5.5 kV DC link. It used 1700 V IGBTs, with a 1 kHz carrier frequency, and included 18 double submodules. Each module incorporated IGBT half-bridges, capacitor banks, sensors, gate drivers and local control and communications hardware. The team tested initial modules for functions including capacitor charging and discharge, sensor calibration, switching dead time, short-circuit shutdown, thermal behavior, and responses to loss of power or communication.

A dedicated test setup supplied the DC link and returned power through a transformer to the laboratory’s 400 V network. It also included a braking chopper to dissipate excess DC-link energy during an overvoltage condition, along with measurement equipment for converter currents and voltages. This made it possible to assess the assembled system beyond simulation, while keeping the test conditions within the laboratory’s available infrastructure.

Commissioning proceeded from reduced-voltage, no-load operation to three-phase tests and operation with a resistive load. Measurements showed balanced voltage waveforms and the expected stepped output. The team then repeated key tests at full voltage: the report records three-phase operation at 3.3 kV and 13 voltage levels. With a resistive load connected through the output transformer, the measured output current was about 9.5 A. The available load limited operation to 50 kW, so the demonstrator was not tested at its 350 kVA rating or at full power.

What the results mean for system design

The project demonstrated that a modular medium-voltage converter and distributed EtherCAT-based control could be assembled and operated together at full voltage in a laboratory test environment. It also validated key elements of the hardware, communications and modulation approach. These results support further evaluation of MMC technology for wind power, but they do not establish full-rated performance, a specific reduction in filter size, or commercial readiness.

For engineering teams, the practical lesson is to evaluate the converter as an integrated system. Module design, protection, thermal management, synchronization, communications timing and test infrastructure all affect whether a modular architecture can be commissioned reliably. A staged validation plan—from individual switching cells to reduced-voltage operation and then full-voltage testing—can expose integration issues before higher-power trials.

Conclusion

The 350 kVA demonstrator showed how an MMC can combine stepped medium-voltage output with local FPGA control and an industrial EtherCAT network. Full-voltage tests confirmed balanced, 13-level operation, while the test rig’s load capacity limited power testing to 50 kW. For wind energy applications, the work provides a validated foundation for further investigation—not a substitute for full-power testing and application-specific grid and thermal qualification.