Waste heat energy harvesting can help turn an otherwise unused process output into electricity. That possibility is particularly relevant at remote industrial sites, where access to grid power may be limited and delivering fuel for generators can be costly or difficult. Pairing heat-to-power equipment with remote monitoring can also help operators and service teams oversee installations that are far from a workshop or support team.
A system developed by Viking Heat Engines with AVL Schrick illustrates this approach. Its CraftEngine uses a piston-based expansion process to convert thermal energy into electrical power. Prototype units were deployed internationally, including at sites where waste heat could support both the main process and the electricity needed to operate it.
How waste heat energy harvesting works
The CraftEngine uses the changing pressure and phase of a working fluid to drive a piston. As the fluid changes phase under different pressure conditions, it moves the piston and enables the system to generate electricity. The source describes the engine as operating according to the Organic Rankine Cycle (ORC) principle.
A compact, 10 kW single-cylinder version was developed to generate power from waste heat at temperatures of 80°C and above. Unlike the turbine-based solutions discussed in the source, the piston engine is designed to accommodate heat from both liquid and gaseous media. It can also operate at partial load without a reported loss of efficiency. Its operating speed can vary between 500 and 1,500 rpm, with a converter system producing the required grid frequency.
These characteristics make the technology relevant to processes where heat availability or operating conditions vary. The equipment is described as robust and comparatively inexpensive to manufacture. Whether it is suitable for a specific installation will depend on the available heat source, the process requirements and the practical economics of deployment.
Why remote sites can benefit
The value of waste heat recovery is not limited to reducing the amount of energy discarded by a process. At an isolated site, locally generated electricity can reduce reliance on fuel deliveries. The source notes that low energy prices in Germany could make payback periods a barrier there, while remote locations with limited infrastructure may find the technology particularly useful.
One example described is rice drying in Colombia. Plant residues are burned to produce heat for drying the rice. The process also requires electrical power for its controls, previously supplied by diesel generators. Transporting diesel to remote fields was expensive and risky. By using the CraftEngine to generate electricity from the heat already produced, the operation could use that thermal energy for both drying and power generation.
The practical lesson is to consider the complete energy flow of a process. A heat source that is already needed for production may also be capable of supporting electrical loads. Evaluating that opportunity requires understanding when and how heat is available, what power the site needs, and how equipment will be maintained once installed.
Remote monitoring is essential to deployment
Remote installations create a service challenge: sending a technician to an isolated site can take substantial time and money. In the early stages of operation, teams may also need access to equipment data to assess performance and identify opportunities for adjustment. For these reasons, Viking Heat Engines made remote access and internal network communications a requirement for its installations.
The system described uses an eWON Flexy remote access router and an industrial Ethernet switch from Wachendorff Prozesstechnik. The router enables communication with the controller and other networked devices. Through the Talk2M service portal, an authorized user can establish a secure VPN connection. The described setup uses an outgoing connection over SSL, allowing communication without requiring changes to customer IT security settings in the tested cases.
Using the router and the M2Web service, the team can access the controller visualization and data from connected network participants through a web browser. Service personnel can also connect to the controller using eCatcher to adjust its program. These capabilities support remote troubleshooting and software updates, reducing the need for an on-site visit for every service task.
From remote access to ongoing optimization
Remote connectivity can support more than responding to faults. The source also identifies recording plant data and establishing alarm management as future steps. These functions could help teams evaluate installations and plan maintenance more effectively, while giving them information to guide further system optimization. They should be understood as planned developments in the described case, not as confirmed outcomes for every installation.
For engineers and operations leaders, the network design is part of the overall system architecture. Remote access needs to work reliably across the customer’s network environment, and service teams need appropriate access to controls and data. The chosen equipment should therefore be assessed not only for its local automation role, but also for how it supports secure communication and service over the equipment lifecycle.
Practical implications for industrial teams
Waste heat energy harvesting can offer a way to use thermal energy that would otherwise leave the process. At remote sites, the resulting electricity may be especially valuable when grid access is unavailable or fuel deliveries are difficult. The CraftEngine example also shows why mechanical design and digital serviceability should be considered together: generating power on site is only part of the challenge if the equipment is difficult to monitor or maintain.
When assessing a heat-to-power project, teams should map available heat sources and electrical demands, consider how the equipment will operate under changing loads, and plan for remote monitoring and service access. Integrating these considerations early can help determine whether a solution is practical for a particular process and location.