Advanced metering infrastructure (AMI) is often discussed as a way to automate meter reading. But its broader value depends on how smart meters connect to communications networks, data systems and utility workflows. Public Service Electric and Gas Company (PSE&G) described this approach in a 2018 proposal for its Energy Cloud program: a platform intended to support customer services and distribution operations as well as meter data collection.

The proposal offers a useful view of the engineering and operational considerations involved in treating AMI as a foundation for wider utility capabilities—not simply as a meter replacement project. Its benefits were projections in the company’s filing, rather than a guarantee of results.

Advanced metering infrastructure as a utility platform

PSE&G’s proposed Intelligent Energy Service Platform (iESP) combined three core elements: smart electric meters, a two-way communications network and back-office data management systems. Together, these components were intended to provide utility teams with more timely information from customer meters and a basis for additional applications.

The plan called for approximately 2.2 million electric smart meters across the company’s service territory, with deployment over about five years. It also proposed extending an existing radio-frequency mesh network, including additional data collectors and routers. Electric meter installations were to follow communications network deployment, linking field infrastructure with the systems needed to receive and use meter data.

This sequence matters operationally: the value of interval or event data depends on whether it can be communicated, managed and applied within relevant business processes. AMI therefore involves more than installing devices. It also calls for technology integration, operational planning, governance, change management and customer communication.

From meter data to operational use cases

PSE&G organized its longer-term vision around six connected domains: smart customers, homes, cities, operations, networks, and products and services. The initial release focused on 22 use cases selected from a broader roadmap of 70. The remaining capabilities were intended for later releases and would require further evaluation and planning.

For utility operations, proposed applications included automated meter reading, remote disconnect and reconnect, automated move-in and move-out processes, voltage monitoring, load profiling, network connectivity analysis and revenue protection. These capabilities depend on combining meter information with operational, customer or network data. For example, meter-level voltage readings could help investigate power-quality issues, while load information could support assessment of asset loading and distribution planning.

Customer-facing applications included usage and bill alerts, rate comparisons, energy-efficiency information, and support for customers with distributed energy resources such as solar and electric vehicles. The proposal also described using more detailed information to support customer service and self-service tools. Such applications connect technical data capabilities with processes for billing, communications and service delivery.

How smart meters can improve outage response

One of the clearest operational examples in the proposal was outage detection and restoration. Traditional circuit-level information may show that an area has lost power without revealing which individual services remain interrupted after primary distribution equipment has been restored. These secondary or “nested” outages can otherwise surface through additional customer calls or follow-up field activity.

With communications to individual meters, operators could check whether specific premises have power and use that information to locate remaining interruptions. The proposal anticipated that better visibility could help crews identify work before leaving an area, reduce repeat visits and improve restoration communications, including estimated times of restoration. These are intended benefits of the use cases; actual results depend on implementation and operating conditions.

PSE&G’s filing estimated $44 million in benefits through 2037 from smart-meter-supported restoration activities, including shorter outage tails and fewer truck rolls and customer calls related to nested outages. The filing also noted that the value customers place on service during an outage was not included in that estimate.

Planning deployment and evaluating the business case

AMI programs require coordination among field installation, communications coverage, meter data management and utility operating systems. PSE&G’s proposed rollout included a gradual deployment followed by a faster installation phase, alongside program management and people and process change work. The proposal applied to electric residential and commercial or industrial customers. It did not propose smart gas meters in Release 1; the company’s plan instead relied on automated meter reading for gas meters.

The business case in the filing projected $843 million in customer benefits and $887 million in operational benefits over nearly 20 years, against approximately $794 million in deployment costs. Those figures were estimates for the proposed program, not measured outcomes. For decision-makers assessing a comparable initiative, the practical lesson is to examine both infrastructure costs and the specific use cases expected to produce value, including the systems and process changes each one requires.

Practical implications for utility and automation teams

AMI can provide a foundation for greater grid visibility and new customer and operational capabilities, but the platform’s usefulness depends on integration. Engineers, system integrators and utility leaders should consider how meter communications connect to back-office applications, how data will support operational decisions, and how responsibilities will change across field and customer-facing teams.

PSE&G’s Energy Cloud proposal illustrates this platform approach: start with meters, communications and data services, then apply them to defined operational and customer use cases. For organizations planning smart meter deployment, the practical priority is to align infrastructure rollout with clear use cases, implementation planning and a disciplined assessment of projected versus realized benefits.