Facility capacity is closely tied to operational effectiveness: crowded work areas, dispersed storage and inadequate parking can complicate daily routines even when an organization’s mission remains unchanged. The AMOC facility expansion at March Air Reserve Base (ARB) illustrates how infrastructure plans can be recalibrated when staffing forecasts and mission requirements evolve. The project pairs additional administrative space with a warehouse, parking and an equipment display area, while subjecting the proposed work to environmental review.

Why the AMOC facility expansion changed scope

The U.S. Customs and Border Protection (CBP) Air and Marine Operations Center (AMOC) has operated at March ARB since 1988. Its existing facility was initially built for 65 personnel. By the time of the 2019 environmental assessment, approximately 249 full-time personnel were working at the center, and the projected requirement had risen to as many as 326.

That forecast was lower than the growth anticipated in a 2011 plan, which considered expansion for a workforce of up to 700. The earlier proposal envisioned a roughly 90,000-square-foot, two-story building. AMOC’s mission and staffing expectations later changed, and some facilities had already been added, including modular buildings and a 22,000-square-foot building. The 2019 assessment therefore considered a smaller, revised project rather than simply carrying forward the earlier design.

The stated need was to provide facilities for the anticipated workforce, support day-to-day operations and give personnel and visitors adequate parking. The center’s mission involves coordinating air and marine operations to detect, interdict and prevent terrorism and unlawful movement across U.S. borders. In this context, the assessment describes the expansion as an operational infrastructure requirement, not a change to the mission itself.

What the March ARB project includes

The preferred alternative combines several components on land operated by the Air Force Reserve Command at March ARB:

  • Administrative space: A new, single-story building of approximately 25,000 square feet, immediately north of and adjacent to the existing AMOC building. It is intended to accommodate the projected 326-personnel requirement.
  • Existing modular buildings: Minor exterior renovations to make the two modular buildings more visually consistent with nearby permanent structures.
  • Warehouse: A 20,000-square-foot building for janitorial and facility-maintenance supplies and computer equipment. The assessment notes that these materials were being stored in several locations, including the existing building, containers, a base storage garage and an exterior courtyard.
  • Parking: A new area with 256 spaces, positioned east of the new facility to serve staff, visitors and government-owned vehicles.
  • Air and Marine Park: A display area for retired aircraft and equipment associated with AMOC operations, with a gazebo and pathway. The plan also includes relocating the Ku and Coalition Tactical Awareness and Response antennas to the park.

Together, these elements address different facility functions. Office space supports administrative work; dedicated storage consolidates materials that had been kept in multiple places; and the parking area serves the anticipated workforce and visitors. The park is intended for equipment display and visitor use, rather than operational storage.

Environmental review and the no-action comparison

The Air Force prepared the environmental assessment in coordination with CBP, tiering it on the 2011 CBP environmental assessment. Tiering allows an agency to use relevant earlier analysis while focusing the newer review on the current proposal and its potential effects. The assessment examined direct, indirect and cumulative effects, and considered the project under applicable environmental requirements, including the National Environmental Policy Act, the Endangered Species Act and the National Historic Preservation Act.

The analysis covered topics such as air quality, water resources, biological and cultural resources, soils, hazardous materials, land use, utilities, traffic, safety and socioeconomic conditions. The document also describes environmental commitments concerning vegetation, wildlife, water, air quality and cultural resources. These commitments form part of the project’s environmental planning alongside agency coordination and public review.

The required no-action alternative provided a comparison. Under that option, AMOC would remain in existing facilities without the proposed warehouse, added parking or park, and would not accommodate the anticipated staffing increase. The assessment states that existing space and current staffing would constrain operations. The Air Force’s Finding of No Significant Impact (FONSI) records its determination that the proposed action would not require an environmental impact statement based on the review.

Lessons for facility capacity planning

For industrial and other mission-critical organizations, the project highlights several practical considerations when planning facility changes:

  • Update assumptions before finalizing design. The difference between a 700-person forecast and a 326-person requirement materially changed the scale of the proposed building.
  • Plan storage as part of the operating environment. The warehouse responds to materials and equipment being distributed across several locations, rather than treating storage as an afterthought.
  • Assess supporting infrastructure together. Administrative space, vehicle parking, access, security and visitor needs are connected planning issues.
  • Compare the proposal with the status quo. A no-action alternative clarifies what existing facilities can—and cannot—support if expansion does not proceed.

The AMOC case is not an industrial automation deployment, but its planning principles are relevant to technical decision-makers responsible for operational facilities. Capacity forecasts, storage arrangements and supporting infrastructure should reflect current requirements, while environmental and regulatory review should be integrated into project development. The practical outcome is a facility plan sized to the mission it must support, with its operational purpose and potential impacts assessed before implementation.