A die attach epoxy change can affect component qualification records and purchasing controls even when device operation is expected to remain the same. In Final Product/Process Change Notification FPCN22523X, issued on 7 February 2019, ON Semiconductor announced that Ablestik 8900NC would replace Hitachi EN4370K3, a nonconductive die attach epoxy reaching end of life. The change covered specified devices in TSOP5, TSOP6, US8, SC82 and SOT23A packages.

For engineers and operations teams, the central point is that the notification describes an assembly-material substitution—not a redesign of the affected devices. The manufacturer reported no change to electrical characteristics, product testing or product marking. Teams managing approved parts, supplier notifications and production records should still confirm whether their specific part numbers are included and how the new material is identified.

What changes in the die attach process?

Die attach epoxy is the material used to attach a semiconductor die within its package. In this notification, the specified material in the assembly bill of materials changes from nonconductive Hitachi EN4370K3 to nonconductive Ablestik 8900NC. ON Semiconductor said the replacement was required because EN4370K3 was reaching end of life and might no longer be available after the change approval cycle.

The notification identifies ON Semiconductor’s Seremban, Malaysia site as the affected site and lists no external foundry or subcontractor sites. The change was scheduled for a proposed first ship date of 14 May 2019. The notification stated that materials assembled with the new epoxy would be identifiable by date code, while product marking would not change.

Qualification evidence and reported results

The notification summarizes qualification testing on representative qualification vehicles in several package types. The listed tests include temperature cycling, high-temperature storage, pressure-cooker testing, highly accelerated temperature and humidity testing, unbiased humidity testing, preconditioning and solder heat resistance. Test methods cited include JESD22 procedures and J-STD-020/JESD-A113 preconditioning.

For the reported test entries, the results are shown as zero failures among the stated sample counts—for example, 0/252 or 0/756, depending on the test. These results apply to the specific qualification vehicles and conditions listed in the notice; they should not be interpreted as a guarantee of performance in every application or as a substitute for reviewing the full qualification documentation.

The qualification vehicles listed include:

  • NLV7SB3257DTT1G in SC82
  • NCV551SN30T1G in TSOP5
  • NCS2002SN1T1G in TSOP6
  • NLV7WBD3125USG and N24C64UVTG in US8

The notification also states that electrical characteristics are not impacted. It reports no test change and no product marking change. For a quality or engineering review, these statements help define the expected scope of the change, but they do not remove the need to assess the change against an organization’s own approval and documentation requirements.

Which components are affected?

FPCN22523X includes an affected-parts list spanning logic devices, memory products and other standard part numbers. The list connects part numbers with qualification vehicles, but it is not reproduced in full here. The notice cautions that its list contains standard, off-the-shelf part numbers only. Custom parts affected by the change are identified through a customer-specific PCN addendum or the PCN Customized Portal.

That distinction matters when a bill of materials uses customer-specific ordering codes, approved alternates or internal part-number mappings. A purchasing or engineering team should compare the complete manufacturer part number—not just a device family or package name—with the applicable PCN records. Where a custom part is involved, the customer-specific addendum is essential to establishing whether the change applies.

Practical steps for engineering and operations teams

A material substitution can flow through several control systems even if no electrical or marking change is specified. A proportionate review can include the following actions:

  • Check the affected-part list. Verify each relevant manufacturer part number against FPCN22523X and any customer-specific addendum.
  • Review qualification requirements. Determine whether the published reliability summary is sufficient for the application and internal approval process, or whether additional reliability data is needed.
  • Update component records. Record the epoxy change and the notification reference in approved-vendor, quality and engineering change documentation where required.
  • Plan traceability. Because the new material is identified by date code, retain incoming-lot and date-code information needed to distinguish material transitions in inventory and production records.
  • Coordinate supply and production teams. Ensure that purchasing, receiving, quality and manufacturing use consistent part-number and lot controls during the transition.

The original notice said FPCNs were issued 90 days before implementation and that the change would be considered accepted unless a written inquiry was made within 30 days of delivery. Those timelines are specific to this 2019 notification; teams handling current component changes should follow the dates and response instructions in the relevant notice.

Conclusion: treat material changes as controlled changes

FPCN22523X documents a nonconductive die attach epoxy replacement from Hitachi EN4370K3 to Ablestik 8900NC for specified ON Semiconductor devices. The manufacturer reported no change to electrical characteristics, testing or product marking, and provided reliability results for representative qualification vehicles. For component users, the practical priority is to verify affected part numbers, review qualification evidence against application requirements and preserve date-code traceability. That disciplined review helps maintain accurate approved-part records and controlled production decisions through a supplier material transition.