Digital twin infrastructure projects offer a useful reference for industrial automation teams evaluating how digital models can support project delivery and asset management. The examples highlighted in Bentley Systems’ 2019 Infrastructure Yearbook show a common shift: from disconnected design files and static documents toward coordinated models and information that can be used across project stages. For plant engineers, system integrators and operations leaders, the practical question is how to connect engineering information, construction planning and operating assets in ways that support better-informed decisions.

What digital delivery means for infrastructure teams

Digital delivery is more than creating a three-dimensional model. The Yearbook describes digital twins through three linked elements: digital context, digital components and digital chronology. Context represents the current physical condition of a site or asset, informed by reality modeling or sensor outputs. Components are the intelligent elements represented in a building information model or classified from reality data. Chronology adds the dimension of time, capturing changes, construction sequences or performance trends.

Together, these elements can make a model more useful throughout an asset’s lifecycle. Rather than treating design information as a deliverable that becomes static after a project phase, teams can use a connected model to coordinate work, review changes and understand how an asset develops over time. The value depends on keeping information accessible and appropriately coordinated across the people and disciplines involved.

Connected data environments support coordination

Large infrastructure and industrial projects typically involve multiple engineering disciplines, contractors and owners. A connected data environment gives participants a shared place to manage project information and work from coordinated models. In the Yearbook examples, this approach supported collaboration across design and construction, helping teams review information, manage revisions and address issues before they disrupted later work.

The Henan Jiyuan iron and steel energy-saving renovation project illustrates the relevance to industrial facilities. The project involved replacing an existing generator with an 80-megawatt, high-temperature, ultra-high-pressure gas power generation unit. A connected data environment was used to streamline workflows and resolve design issues. The project team combined an integrated 3D model with tools for plant and piping design and analysis, while construction sequencing tools supported the delivery schedule.

For industrial automation and engineering teams, the broader lesson is to consider information management alongside the technical design. Models are most useful when stakeholders can find current information, understand how disciplines relate, and coordinate changes without relying on separate, inconsistent records.

Using 4D construction modeling to test the plan

4D construction modeling links a three-dimensional model to a project schedule. This lets teams visualize how planned work will progress over time and examine the relationship between construction activities, site logistics and design elements. It is not a substitute for sound scheduling or coordination. Instead, it provides another way to review whether the plan is understandable and workable before activities reach the site.

Several Yearbook projects used this approach to manage complex construction sequences. At Chase Center in San Francisco, the project team divided the design into definable sections and used iterative simulation reviews to examine site logistics and critical-path elements. On the Thames Tideway East project in London, 4D models supported planning and communication for tunnel and shaft construction; weekly collaborative planning meetings helped keep the models updated. In both cases, visualizing time-linked work gave participants a shared basis for discussing sequence and coordination.

These practices can also inform industrial project work, where construction or refurbishment must be coordinated across disciplines and work packages. Teams can use a time-linked model to discuss interfaces, make planned activities more visible and identify questions that need resolution ahead of execution. The specific benefits depend on project requirements and on the quality of the schedule and model information.

From project models to asset performance

The potential of a digital twin extends beyond construction. Infrastructure owners and operators can use connected information to support ongoing asset management, provided that useful data is maintained and made available through the relevant workflows. The Yearbook’s H2PORTO platform in Porto, Portugal, demonstrates this idea in a water-network context. It brought together models, data from multiple sources and intelligent sensors to create a digital representation of water, wastewater, stormwater and bathing-water systems. The stated aims included forecasting, predictive performance and more proactive network management.

Although a water network differs from a process plant, the information-management challenge is familiar: operational insight depends on integrating information that may originate in different systems and formats. For industrial asset owners, this reinforces the importance of defining what information is needed for operations, how it will be maintained and how teams will use it—not simply how a model will be produced during design.

Practical considerations for industrial teams

Projects featured in the Yearbook point to several considerations for organizations developing digital workflows:

  • Set the information objective. Decide what project or operational decisions the model and connected data should support.
  • Coordinate disciplines early. Bring design, construction and owner-operator requirements into the information workflow before interfaces become late-stage problems.
  • Connect models to time where useful. Use 4D visualization to examine construction sequence, logistics and activity dependencies.
  • Plan for the asset lifecycle. Consider how project information will be transferred, maintained and used after construction.
  • Keep shared information current. A connected environment only supports collaboration when participants can work with dependable, appropriately managed information.

Conclusion: Make the digital workflow serve the work

The practical value of digital twin infrastructure is not the model alone. It comes from connecting physical context, intelligent asset information and change over time to real project and operational workflows. For industrial automation stakeholders, the examples show how coordinated models, shared data environments and 4D planning can support clearer communication across disciplines and phases. Start with the decisions that need to improve, then shape the information and collaboration processes around those needs.