Exergy analysis can help plant teams distinguish between energy that remains available to do useful work and energy lost through irreversible processes. That distinction matters when evaluating a steam power plant at partial load: a unit may continue to generate electricity, but its efficiency and the distribution of losses can change with operating conditions. An analysis of the Villa de Reyes thermoelectric plant in San Luis Potosí, Mexico, examines this issue across a range of loads and identifies components that warrant particular attention.

Why assess a steam plant at different loads?

Power plants do not always operate at their design point. Evaluating performance at several load levels helps determine whether nominal operating points are also favorable from an efficiency perspective. The Villa de Reyes study considered a 350 MW unit using fuel oil and examined design load cases of 25%, 50%, 75% and 100%, as well as additional operating regimes.

The analysis focused on a Rankine cycle with steam reheating and two stages of regeneration. It also included the steam generator, combustion process and heat transfer, rather than treating the steam cycle as an isolated system. This wider boundary is important: fuel combustion and heat exchange affect the steam conditions that ultimately determine cycle output and losses.

How the exergy analysis was built

A simulation model represented the plant’s main thermodynamic states and equipment. Its calculations covered the steam cycle, combustion chamber and heat-transfer sections of the steam generator. Known operating data from the manufacturer’s manual were used to validate the model before it was applied to the exergy and thermoeconomic assessment.

The steam generator model considered fuel flow, the air-to-fuel relationship and flue-gas recirculation when calculating combustion-gas properties. Those properties, including gas temperature and mass flow, informed the heat-transfer calculations. The study also accounted for the geometry of heat exchangers and used an effectiveness-NTU approach to assess heat exchange in relevant sections.

For the cycle analysis, the plant was represented as a reheated, regenerative Rankine cycle. The stated assumptions included steady operation of each component, negligible changes in kinetic and potential energy, and isentropic efficiencies of 85% for the steam turbine and feedwater pumps. These assumptions provide the basis for interpreting the reported results; they are not universal values for other plants.

Exergy analysis results across load conditions

The model identified operating regimes of 95.7%, 75.04% and 74.04% as the most efficient among the conditions assessed. Maximum reported energy and exergy efficiencies were 35.5% and 29%, respectively. For high-load operation above 74%, the thermal efficiency of the steam cycle was reported as approximately 35% ±1%.

These figures describe the studied unit and the model conditions; they should not be treated as benchmarks for other facilities. The practical point is that the most favorable operating conditions did not correspond simply to the nominal load cases listed for model validation. A load assessment can therefore help reveal where the plant performs well and where further investigation may be appropriate.

Where thermoeconomic costs accumulate

Thermoeconomic analysis connects exergy flows with their associated costs. In this study, it helped identify parts of the plant linked to the highest exergetic costs:

  • The steam-generator furnace: Combustion and heat transfer in the furnace are central to converting fuel energy into useful steam conditions.
  • Heat-exchange surfaces: The superheating, reheating and other heat-transfer sections influence how effectively energy moves from combustion gases to the working fluid.
  • Condenser losses: The analysis identified losses in the condenser as another important contributor to the overall exergy cost.

This component-level view can support more focused operational reviews. Rather than treating plant efficiency as a single headline number, engineers can examine where irreversibilities occur and which equipment groups contribute most to the cost of useful output. The results do not, by themselves, specify a particular retrofit or operating change; they help prioritize the areas to examine.

What plant teams can take from the findings

For operators and system integrators, the study illustrates the value of combining equipment-level thermal calculations with whole-cycle performance assessment. A model that includes combustion conditions, steam states and heat-transfer behavior can provide a more informative picture than a cycle-only calculation, provided it is checked against reliable operating data.

When applying this approach to another facility, teams should use that plant’s configuration, operating records and equipment characteristics. Results from Villa de Reyes cannot be transferred directly to a different boiler, fuel, turbine arrangement or condenser. Instead, the methodology offers a framework for evaluating load conditions and locating major sources of exergy destruction in the system under review.

Conclusion

Exergy and thermoeconomic analysis provide complementary ways to assess a steam power plant: one tracks the loss of useful work potential, while the other helps relate those losses to cost. In the Villa de Reyes assessment, the furnace, heat-transfer surfaces and condenser losses stood out, and the modeled efficiency varied across operating regimes. For plant decision-makers, the practical implication is to validate performance models against actual operating data, evaluate more than design-point operation, and use component-level findings to guide further investigation.