Industrial automation risks are not limited to whether a control system or machine performs as specified. They can also arise from project scope, integration work, supplier availability, market conditions and the pace of technological change. A 2017 annual report from ABB describes these pressures from the perspective of a global automation and power technology company. Its disclosures offer a useful framework for engineers, system integrators and operations leaders assessing where uncertainty can enter industrial projects.

The practical lesson is that technical decisions and commercial assumptions are closely linked. A design change can affect schedule and cost; a delayed component can disrupt manufacturing or commissioning; and changing standards may require product or system modifications. Recognizing these dependencies early can help teams make project risks visible and assign responsibility for managing them.

Industrial automation risks begin with project complexity

Long-term, fixed-price and turnkey projects can involve significant exposure because costs and delivery obligations are set before every project condition is known. The work may require products and systems to be modified for specific technical requirements, integrated with existing infrastructure or coordinated with activities such as civil works. The report notes that these projects can take many months or years to complete.

Several factors can move actual costs or timelines away from original projections:

  • Unanticipated design or technical issues, including product modifications and integration challenges.
  • Changes in component, material or labor costs, or delays caused by supply bottlenecks.
  • Permitting, approval or policy changes that affect project execution.
  • Customer-driven scope changes, adverse site conditions, weather or other events outside the project team’s control.
  • Delays or performance problems involving suppliers, subcontractors or consortium partners.

These exposures can compound. For example, a delayed component may hold up installation, while a schedule change can alter labor or other project costs. Contract terms may also include schedule penalties, warranties or other obligations if agreed requirements are not met. For project teams, this makes clear scope definition, interface management and realistic scheduling central to risk control—not merely administrative steps.

Technology change affects competitiveness and lifecycle planning

Automation markets evolve alongside customer requirements and industry standards. ABB’s report identifies the need to develop and adapt products, systems and services as a competitive pressure, particularly where standards change. Falling behind technological developments may contribute to pricing pressure or lower margins for suppliers; for users, it raises practical questions about whether selected systems will continue to meet application and integration requirements.

Engineering teams should therefore consider technology change during both procurement and design. Relevant questions include whether a proposed solution can satisfy the project’s technical requirements, how it will connect with existing infrastructure, and what modifications may be needed if requirements change. These are planning considerations, not guarantees that any particular technology will become obsolete or that a specific upgrade will be required.

Technology risk also intersects with execution risk. Modifying an established product or integrating it into a new environment may introduce unanticipated work. When a project depends on performance across multiple products, systems and site conditions, validation and coordination become important parts of delivery planning.

Supply and cost exposure can affect delivery

The report highlights exposure to commodity-based materials such as steel, copper, aluminum and oil, as well as dependence on third-party suppliers for components and raw materials. Price movements can increase input costs, while limited availability can constrain manufacturing. The risk may be more concentrated when a material or component comes from only one supplier or a small supplier group.

For plant and project decision-makers, supply risk is relevant before a purchase order becomes a schedule commitment. Teams can identify which components are critical to manufacturing, installation or commissioning, clarify supplier responsibilities, and consider the consequences of late delivery during project planning. The report does not prescribe a particular sourcing strategy, but it makes clear that supplier disruption can affect production, customer commitments and profitability.

Cost exposure also deserves attention in fixed-price work. If materials or labor become more expensive after pricing assumptions are set, a supplier may not be able to recover those increases through higher customer prices. Project reviews should therefore test the assumptions behind estimates and distinguish costs or dependencies the project team can manage from those that remain uncertain.

Global operations add market and coordination uncertainty

Industrial suppliers serving multiple regions may encounter differences in economic conditions, political environments, currencies, regulations and access to financing. ABB’s filing describes how economic slowdowns can affect customer investment decisions, including the possibility that purchases are delayed or canceled. It also notes that exchange-rate movements can change reported financial results and affect transactions where sales and production costs use different currencies.

These corporate-level exposures have project-level implications. A customer investment decision may change; a permit or local requirement may complicate execution; or costs may shift when currencies move. For teams delivering across borders, it is useful to make regional assumptions explicit and understand which decisions depend on customer funding, approvals, suppliers or local operating conditions.

Build risk reviews around connected dependencies

A useful project risk review should connect technical, commercial and operational issues rather than treating them as separate checklists. Teams can:

  • Confirm the scope, acceptance criteria and system interfaces before execution.
  • Identify technical modifications, site dependencies and approval requirements.
  • Track critical components and supplier dependencies against the project schedule.
  • Review cost, labor and timing assumptions that could change during delivery.
  • Assign owners to risks and revisit them when scope, suppliers or site conditions change.

These steps do not eliminate uncertainty, but they make dependencies easier to discuss and manage across engineering, procurement, project management and operations.

Conclusion: Make uncertainty part of project planning

The risks described in ABB’s 2017 filing show how automation project outcomes can depend on more than equipment selection. Complex integration, evolving standards, supplier constraints, cost changes and global conditions can interact to affect delivery and commercial results. For industrial organizations, the practical priority is to identify those connections early, test project assumptions and keep risk ownership clear as requirements and conditions evolve.