Access Official Technical PDF

Share Summary:LinkedInEmail

Industrial automation standards influence how equipment is specified, integrated, tested and maintained. A UNE bulletin from 2018 illustrates the range of proposed work relevant to automation teams in Spain and across European supply chains, covering measurement instruments, machinery, electrical equipment, electromagnetic compatibility (EMC) and energy management. These entries describe projects at different stages of development; they should not be treated as final requirements or as a statement of current standards.

For engineers, system integrators and plant leaders, the practical value of a standards bulletin is early visibility. Tracking proposals can help identify areas for technical review, supplier discussions and future documentation updates—while keeping a clear distinction between a draft and an approved publication.

What the 2018 proposals mean for industrial automation standards

The bulletin includes national UNE projects as well as proposals associated with European and international standards work. The project labels identify where a document is in its development process. Terms such as draft, formal vote and publication do not mean the same thing: a proposal open for comment may still change, while a published standard has completed its approval process.

This distinction matters when planning a controls upgrade or writing a procurement specification. A draft may be worth monitoring, but it should not be cited as an adopted requirement unless its status has been confirmed. The bulletin is a historical snapshot from 2018, so teams should check the applicable edition and present status before relying on any listed item.

Measurement, control and machinery safety

Several proposed documents address equipment used to measure, control or verify industrial systems. The list includes particular safety requirements for electrical measuring and control equipment, including hand-held current sensors, multimeters, refrigeration equipment and machinery. It also identifies work on thermographic cameras used in industrial process control, focused on metrological characterization and calibration.

These topics connect directly to routine engineering decisions. Measurement devices support commissioning, troubleshooting and maintenance, while calibration and defined test methods help teams understand how readings are obtained. For integrators, requirements for equipment used in machinery can also be relevant when selecting components or documenting the safety basis of an installation.

The bulletin also lists proposals related to industrial equipment and electrical systems, including environmental testing and the solderability of electronic components and printed circuit boards. Such topics can affect component acceptance and assembly quality. They are not substitutes for project-specific validation, but they signal areas where test practices or technical expectations may be under review.

EMC and dependable electrical integration

EMC appears across several entries, including proposed requirements for measurement and protection relays, as well as amendments concerning emissions and immunity. The list also includes an amendment to the AS-Interface (AS-i) sensor/actuator interface standard.

For automation projects, EMC considerations span devices and the systems into which they are installed. A change to a product or interface standard may prompt engineering teams to check equipment documentation, integration assumptions and verification plans. It does not, by itself, establish that an existing installation is non-compliant. Teams should assess any confirmed revision against the equipment, application and regulatory context in question.

Other electrical proposals listed include safety provisions for equipment intended for explosive atmospheres and requirements for low-voltage installations in particular locations. These areas can matter in plants with specialized operating environments. The relevant standard and edition should be identified during design and review rather than inferred from a proposal title alone.

Energy management, lifecycle and industrial equipment

The bulletin identifies a UNE adoption project for ISO 50003, which concerns requirements for organizations auditing and certifying energy management systems. This is distinct from a technical specification for an individual machine: it addresses the bodies that perform audits and certification. Its appearance alongside other industrial topics highlights the connection between plant operations and formal energy-management processes.

Lifecycle issues also feature in the proposed IEC 62402 document on obsolescence management. For plant owners and operations leaders, obsolescence can be a planning concern when control-system components or other equipment become difficult to source. A standard in development may offer a framework to monitor, but the bulletin does not describe its detailed provisions. Teams should consult the final document before adopting specific processes on its basis.

Additional proposals relate to rotating electrical machines, including requirements for synchronous generators driven by steam or gas turbines, and test methods for induction-heating installations. These entries may be relevant to facilities with such equipment and to suppliers or integrators working on those applications. Their presence in the bulletin is an indicator of standards activity, not evidence that a particular plant uses the technology or must make an immediate change.

How to use a standards bulletin in project planning

A useful review process separates awareness from action. When a relevant proposal appears, technical teams can:

  • Confirm its status: Determine whether it is a draft, a voting document, an amendment or a published standard.
  • Check the scope: Compare the document’s stated subject with the equipment, process and jurisdiction involved.
  • Assess potential interfaces: Consider whether it could affect specifications, supplier evidence, testing, maintenance or management-system documentation.
  • Verify the final edition: Before changing requirements, consult the applicable published version and confirm any transition or adoption details.

This approach helps avoid two common errors: overlooking relevant standards activity and treating every announced proposal as an immediate compliance obligation. It also gives procurement, engineering and operations teams a shared basis for deciding what merits further investigation.

Conclusion

The 2018 UNE bulletin shows how industrial automation standards development can touch many parts of a plant: measurement and control equipment, machinery safety, EMC, electrical installations, energy management and equipment lifecycle planning. Its practical lesson is to monitor relevant work, interpret each document according to its development stage and verify the adopted requirements before acting. That discipline supports better-informed specifications and reviews without confusing proposed standards with binding or current ones.

Access Official Technical PDF

About The Author