For teams evaluating facility changes, equipment projects, or environmental records, Michigan air permits can be an important part of the site information to review. The Michigan Department of Environment, Great Lakes, and Energy (EGLE) Air Quality Division’s listing presents active Permits to Install (PTIs) approved since 1997. The document is organized by company and, in the provided pages, spans a wide range of facilities and activities across Michigan.
The list is a directory of permit records, not a complete account of a facility’s current operations or all of its compliance obligations. Used with that limitation in mind, it can help engineers, system integrators, plant managers, and project teams identify records associated with a company or site and determine what information to check next.
What the EGLE Air Quality PTI list contains
The listing includes fields such as company, city, county, street address, ZIP code, State Registration Number (SRN), approval date, PTI number, and notes. Together, these details help distinguish records that might otherwise appear similar. A company may have several entries, multiple locations, or more than one PTI associated with a single site.
The document is dated December 8, 2024, and describes its entries as active PTIs approved since 1997. Its pages are sorted by company name. This makes it useful for looking up a known organization, but it is not arranged as a chronological list of approvals or a site-by-site map.
How to interpret key permit fields
- Company and location: The company name, city, county, and address help identify the organization and site connected to an entry. Check the address carefully when a company has multiple facilities or when names have changed.
- SRN: The State Registration Number is a site identifier shown in the listing. It can help connect multiple permit entries to a facility, even when the company name or permit number differs.
- Approval date: This indicates when the listed PTI was approved. The date alone does not explain the scope of the permit or establish whether a particular piece of equipment is covered.
- PTI number: Each row includes a permit identifier. Keep this number with the site and SRN when documenting a record or requesting additional information.
- Notes: Entries may carry descriptions such as “General PTI,” “Revised,” or “Rolled into ROP.” These labels are useful cues, but they do not provide the permit’s full terms.
Why the list matters to industrial project teams
A manufacturing or infrastructure project can involve changes to equipment, processes, or a facility’s configuration. When reviewing a site, project teams can use the EGLE listing as an initial record check: identify the correct facility, note its SRN, and collect the relevant PTI numbers and approval dates. Those identifiers provide a more reliable basis for follow-up than a company name alone.
For example, the listing includes multiple entries for some organizations at the same address, with different approval dates and PTI numbers. It also includes facilities where notes indicate that records were rolled into an ROP. These patterns reinforce the need to review records at the individual site and permit level rather than assume that one entry describes every operation at a location.
In project documentation, a simple record log can capture the company name, facility address, SRN, PTI number, approval date, and any note shown in the listing. Keeping those fields together can help environmental staff and engineering teams discuss the same record and identify where a closer document review is needed. The directory itself does not establish whether a proposed modification requires a permit or whether existing authorization covers a specific change.
Important limits when using the PTI database
The PTI list is a starting point, not a substitute for the underlying permit documents or facility-specific review. A record’s presence does not, by itself, explain its equipment scope, operating conditions, or current applicability. Likewise, a brief note in the table should not be treated as a complete description of a permit’s regulatory status.
Before relying on a listing for a project decision, confirm that the company and address match the facility under review, then locate and review the relevant permit documentation. Where the table is ambiguous or a project could affect regulated equipment or processes, coordinate with the facility’s environmental personnel and seek the appropriate regulatory guidance.
Using Michigan air permit records effectively
EGLE’s active PTI listing provides a structured way to find air permit records by company and connect them to locations, SRNs, approval dates, and permit numbers. For industrial teams, its practical value is in organizing an initial review and establishing identifiers for follow-up—not in replacing a technical or regulatory assessment.
When planning facility work, treat the listing as one input to project due diligence. Verify the site, track the associated records, and consult the underlying permit documents before drawing conclusions about equipment or proposed changes. This approach helps operations and engineering teams use Michigan air permits information accurately while keeping decisions grounded in facility-specific documentation.