Renewable energy at Superfund sites offers a practical way to put constrained properties to productive use while, in some cases, supplying power for cleanup activities. A September 2018 U.S. Environmental Protection Agency update counted 61 alternative energy projects across 59 Superfund sites, with approximately 360 megawatts (MW) of installed capacity. The projects illustrate both the potential of site reuse and the engineering coordination needed to work around landfill caps, slopes and other site conditions.

Renewable energy at Superfund sites: the 2018 snapshot

In the EPA update, alternative energy refers to energy from non-fossil and non-nuclear sources. Solar accounted for nearly 75 percent of the projects, while solar, wind and landfill gas together represented about 92 percent. Biomass and geothermal installations were also included. About 64 percent of projects had an installed capacity of at least 1 MW.

The reported portfolio had an estimated annual output of 991,136 megawatt-hours, based on output information available for 44 projects. These figures were estimates drawn from publicly available information, communication with EPA staff and feedback from project stakeholders. They describe the project landscape as of September 2018, rather than current capacity.

For plant and operations teams, an important distinction is how these installations relate to site activity. About 26 percent of the projects either offset energy demand associated with cleanup or directly powered cleanup work. Others generated energy for use beyond the cleanup operation. The largest installation listed was a 37.5-MW biomass plant at Gallup’s Quarry in Connecticut.

Why reuse contaminated or capped land?

Some remediated or managed properties can be difficult to develop for conventional uses. Renewable energy infrastructure can offer an alternative, provided the proposed use is compatible with the site’s environmental controls and physical conditions. For solar projects in particular, site planning must account for more than array capacity: the available footprint, terrain and integrity of a landfill cap can shape the design and construction approach.

The EPA also tracked projects in planning and construction. At the time of the update, examples included a proposed 10-MW solar project at Auburn Road Landfill in New Hampshire and a 3-MW project at the Pacific Coast Pipe Lines site in California. These examples indicate that project development can extend beyond already operating installations, though the status and details cited are specific to the 2018 update.

Iron Horse Park: designing around a landfill cap

The Iron Horse Park case in Billerica, Massachusetts, demonstrates how a solar project can be adapted to landfill conditions. A portion of the property, Shaffer Landfill, was not considered suitable for conventional development, but attracted interest as a potential solar site. EPA coordinated with developer UGT on plans intended to use available land while accounting for steep slopes and protecting the landfill cap.

After plan approval in 2012, construction began in 2013 on a 6-MW array covering 25 acres. Rather than using one continuous installation, the developer arranged 20,000 panels in smaller sub-arrays to accommodate the slope. The panels were mounted on ballasted racks, avoiding the need for a traditional system that would penetrate the cap. This design choice addressed a central site constraint: installing energy infrastructure without compromising the protective cover.

EPA provided a comfort letter confirming that plans had been submitted and that development was being coordinated with the agency. The letter also supplied statutory and policy information to help the developers assess the project. The project was completed in 2014, and two additional solar projects subsequently followed at the facility. One 4-MW array is near the entrance; another, completed in 2017, is partly located on a former asbestos landfill.

From generation to local energy benefits

The original 6-MW Iron Horse Park project also demonstrates how the value of a site-based installation can extend beyond the property itself. Under a virtual net metering agreement, subscribers received credits on their electric bills for excess energy produced by their share of the project. The 2018 account stated that the project provided energy for four school systems and the local government through this arrangement.

This example connects technical design with project delivery and energy use. The array’s layout and mounting approach were shaped by site protection requirements, while the agreement determined how project output could benefit off-site users. Renewable energy projects therefore involve more than selecting generation equipment: they require coordination among developers, regulators, property stakeholders and, where applicable, utilities and energy subscribers.

Practical considerations for project teams

For engineers, integrators and site managers evaluating a renewable energy project on a remediated property, the Iron Horse Park experience points to several considerations:

  • Understand site controls early. Identify the areas and protective features that must remain intact, including landfill caps.
  • Adapt the physical layout. Slopes and usable land may call for smaller, separated arrays rather than a single continuous installation.
  • Match mounting methods to site requirements. At Iron Horse Park, ballasted racks avoided cap penetration.
  • Coordinate plans with relevant parties. The project involved EPA, the developer, the town, the Massachusetts Department of Environmental Protection and National Grid.
  • Clarify how energy will be used. A project may support cleanup demand, serve local facilities or provide subscriber credits under an arrangement such as virtual net metering.

These are considerations illustrated by the cited project, not a universal design prescription. Site conditions and applicable requirements determine what approaches are suitable at any particular location.

Conclusion

The 2018 Superfund project inventory showed that renewable generation can be integrated into a range of properties, with solar representing the largest share of installations. Iron Horse Park provides a concrete example of how careful planning can reconcile energy development with landfill protection: the array was divided to suit steep terrain, mounted without penetrating the cap and connected to an arrangement that benefited local energy users. For industrial and environmental project teams, the broader lesson is to treat site conditions, cleanup obligations, stakeholder coordination and the intended use of generated power as connected parts of project planning.