Solar energy zoning determines where solar equipment can be installed and which standards apply. For industrial facilities, businesses and other property owners, clear rules can help make project planning more predictable. In a 2018 workshop, the Village of Hanover Park, Illinois, considered zoning amendments intended to encourage solar installations while establishing requirements for permits, placement and code compliance. The proposals also addressed how the Development Commission conducts its work.
Why Hanover Park considered solar energy zoning changes
The proposed amendments reflected goals in the Village’s 2010 Comprehensive Plan, which called for removing barriers to sustainable development, promoting solar energy and adopting renewable-energy rules addressing setbacks, access, noise and safety. Hanover Park had also participated in the Solar Chicago Pilot Program and sought technical guidance through SolSmart, which reviewed the Village’s zoning code as part of its designation process.
These efforts provided a policy context for updating local requirements. The staff proposal was not simply to permit solar panels: it sought to define a broader range of systems and explain how they would fit within existing zoning and building rules. The document described amendments for discussion and requested feedback before a public hearing; it does not establish that the proposals were ultimately adopted.
Defining solar energy systems by function and form
The draft definitions covered solar collectors and solar energy systems, as well as systems classified by scale, mounting method and location. A system could be building-integrated, building-mounted or freestanding. Building-integrated examples included solar equipment incorporated into roofing materials, windows, skylights or awnings, rather than added as a separate mechanical device.
The proposal also distinguished small-, medium- and large-scale systems by the surface area they occupied, with approximate DC nameplate-capacity equivalents. These categories were intended to describe installations of different sizes, while the definitions allowed for photovoltaic (PV), solar thermal and other forms of solar technology. PV systems convert sunlight into electricity; solar thermal collectors capture heat for uses such as water or space heating. Passive solar design, by contrast, uses building features to collect or control solar heat and daylight without active pumps or fans.
Definitions matter to project planning because equipment may be integrated into a building, attached to a roof or façade, or installed independently on the property. Treating these configurations explicitly can help clarify which zoning standards apply before a project moves into detailed design.
Proposed requirements for installation and placement
The draft would allow solar energy systems as accessory uses in residential and nonresidential zoning districts, subject to district bulk standards and the proposed solar-specific requirements. In the Historic District, the amendments specified that only roof-mounted systems would be permitted.
Among the general requirements in the proposal were:
- A building permit for every solar energy system installation.
- Compliance with applicable state and local codes.
- Minimizing tree removal and limiting signs on system equipment to manufacturer, warning or ownership information.
- Repairing or removing a system if it remained inoperable or abandoned for 12 consecutive months, following Village notice and a 90-day period.
- Meeting accessory-structure setbacks for the zoning district and primary land use.
The proposed height provisions varied by installation. Solar equipment on pitched roofs would have to remain within the district’s maximum building-height limit. Equipment on flat roofs could extend up to eight feet beyond the otherwise applicable maximum under the referenced bulk-regulation provision. Freestanding systems would be subject to a height condition tied to their setback from the lot line. The draft also included provisions for small systems in public ways and private parking lots, with additional review or permits where specified.
For freestanding systems, the proposal said the horizontal projection area could be treated as pervious coverage rather than counted toward lot coverage, provided pervious conditions were maintained beneath the system. That distinction could affect site layout, but it would not remove the need to meet other applicable zoning requirements.
Access, nonconforming properties and practical review
The proposed text referenced Illinois’ Homeowners’ Energy Policy Statement Act in addressing private restrictions on solar systems, including homeowners’ association covenants or restrictions. It also proposed changing the rules for nonconforming buildings and structures so that installing or replacing a building-mounted solar energy system would not, by itself, count as a structural alteration under the cited provision.
For owners and project teams, these provisions would be relevant early in feasibility and permitting. A review would need to consider the system type, mounting location, district standards, building permit requirements and applicable codes. Site conditions such as existing trees and the relationship between a freestanding array and lot lines would also be important. The proposal called for required review rather than treating all installations as interchangeable.
Development Commission procedures were also under review
The workshop agenda included a separate discussion of Development Commission procedures. Staff summarized possible changes to the Commission’s meeting frequency and voting threshold. The proposed text would reduce regularly scheduled meetings from two per month to one, while retaining the ability to hold special meetings with the required notice. The quorum would remain four members.
For recommendations, the draft proposed replacing the requirement for five affirmative votes with a majority of the quorum present. The Commission makes recommendations on zoning matters; final authority to amend the zoning code or approve other matters described in its duties remains with the Village’s governing bodies. The staff memorandum indicated that further direction would be needed before preparing materials for a public hearing.
What the proposals could mean for project teams
Hanover Park’s 2018 discussion illustrates how solar zoning can connect technology definitions with practical land-use controls. Clear categories for building-integrated, mounted and freestanding systems can help property owners, engineers and integrators identify the relevant review path. At the same time, permitting, height, setbacks, coverage, historic-district limits and maintenance provisions shape what can be installed at a particular site.
The practical takeaway is to check current local requirements before relying on a proposed or historical text amendment. For any solar project, coordinate zoning review with building-code compliance and assess the installation’s form and location early. Clear, workable rules can support solar adoption while preserving a defined process for reviewing safety, placement and property impacts.