Semiconductor Test Equipment: Cost, Coverage and Yield

Semiconductor test strategy must balance defect detection, production throughput and equipment cost. The 2003 ITRS roadmap highlights how design-for-test, modular tester architectures and improved yield learning address challenges posed by integration and multi-die packaging.

Read More →