The Washington data center market illustrates how site selection depends on more than electricity rates or land costs alone. A historical analysis by Washington’s Department of Commerce found that the state’s two primary markets—Seattle and north central Washington—offer distinct advantages, but face different competitive pressures. For data center owners, tenants and economic development teams, the practical challenge is matching a project’s technical and financial requirements to the right location.
Data center economics: owner return versus tenant cost
Data center owners typically evaluate a project through return on investment (ROI). Their calculations include the substantial upfront expense of a facility and its supporting infrastructure, such as power, fiber, roads, cooling and fire protection. They also account for ongoing equipment upgrades. The report describes a typical economically productive life span of 10 to 15 years, with infrastructure upgrades recurring on a three- to five-year cycle.
Tenants approach the decision differently. Whether an enterprise leases colocation space or operates a dedicated facility, it is concerned with total cost of ownership (TCO). Relevant costs include rent, electricity, connectivity, management and taxes, as well as the servers and other IT equipment housed in the facility. Location also affects non-financial requirements such as access to staff, network redundancy, latency and resilience.
These different perspectives explain why a site that looks attractive to a facility developer may not suit every tenant. A remote location may support an owner’s cost model while being inconvenient for customers who need hands-on access to equipment. Conversely, an urban facility close to businesses and network interconnection may offer operational benefits despite higher costs.
Why power, taxes and infrastructure shape site selection
According to the report, construction and infrastructure provisioning represented the largest share of overall project costs in the markets it examined. Power and taxes were also important economic factors, while land and labor costs generally varied less between potential sites outside the largest metropolitan areas. This makes electricity pricing and net taxes—taxes after applicable incentives—important differentiators in data center site selection.
Power matters to both sides of a project. Owners assess the effect of electricity costs on operating economics, while tenants consider the expense of the power they consume. Reliable supply, available capacity and the infrastructure needed to deliver power are also essential: if substations, fiber or suitable sites cannot keep pace with demand, construction may be delayed or constrained.
Tax policy can affect both the facility and its occupants. Sales and use taxes on servers and related equipment can influence tenant costs, while incentives may affect an owner’s project economics. The report also notes the importance of predictable incentives, since uncertainty can make a market less attractive to site selectors.
Seattle and Quincy serve different requirements
Seattle: connectivity and urban access
The report characterizes Seattle primarily as a retail colocation market, with demand linked in part to the Seattle Internet Exchange (SIX). Proximity to an internet exchange can appeal to organizations that value interconnection with service providers, low-latency connectivity or access to regional and international networks. Seattle also serves companies that want staff close to their equipment for operational or development needs.
That urban accessibility comes with a different cost profile from central Washington. The report describes Seattle as a more expensive market and notes that its counties did not have access to the same data center sales and use tax exemptions available to eligible facilities in the Quincy area. This was identified as a competitive disadvantage relative to urban markets where sales tax does not apply or incentives offset it.
Quincy: lower-cost wholesale capacity
The north central Washington market, anchored by Quincy, developed around large facilities serving wholesale tenants and enterprise operators. The report identifies lower-cost land and construction, access to water and less expensive power as advantages. Eligible data center owners and tenants could also qualify for sales and use tax exemptions under the policies described in the analysis.
Quincy’s location is less convenient for retail tenants that require frequent physical access. Travel through mountain passes and the distance from major urban centers can add practical friction. Wholesale customers, whose needs differ from those of smaller retail tenants, may be better suited to the market’s operating model.
How to assess market health
Two useful indicators are new construction and absorption. Construction shows how much capacity owners are bringing to market; absorption tracks how much available capacity tenants lease or otherwise claim over a period, often measured in megawatts. Neither measure tells the whole story on its own. New facilities can take years to become operational, while tenant demand can change much more quickly, creating a timing gap between supply and absorption.
The report used an annual growth rate of at least 10 percent in construction and net absorption as a benchmark for a healthy market. By contrast, it described Seattle’s growth at about 3 percent year over year in the period examined. Washington’s available business-income data could not cleanly separate Seattle from Quincy, and the report cautioned that industry reporting was imprecise. Data centers do not have a dedicated NAICS classification, and reported facility size may refer either to server space or to the entire building.
Practical implications for decision-makers
For project teams comparing Washington locations, the analysis points to several questions:
- What is the project’s operating model? Retail colocation and large wholesale or enterprise facilities have different access and service needs.
- Can the site support the required capacity? Evaluate power availability, fiber density and other infrastructure alongside land and building plans.
- What is the full tax picture? Assess applicable incentives and their effect on both facility costs and tenant equipment purchases.
- How important is proximity? Consider staff access, customer visits and interconnection requirements against the cost advantages of a remote location.
The report’s broader conclusion was that Washington had captured relatively little new data center business compared with the growth of the national market. It identified limited industry promotion, confusion about incentives and the competitiveness of urban markets as factors warranting attention. For plant, IT and infrastructure decision-makers, the central lesson is that location economics are project-specific: low power costs can be compelling, but taxes, connectivity, access and available infrastructure determine whether a site meets the complete business and technical case.