Access Official Technical PDF

Share Summary:LinkedInEmail

Industrial automation standards shape how equipment is specified, installed, tested and maintained. A February 2019 standards bulletin from Spain’s UNE system records activity across national, European and international standards bodies. For engineers and plant decision-makers, its useful signal is not a single sweeping change, but a set of developments in industrial communications, electrical equipment, safety and conformity assessment that warrant careful review against the status of each document.

The bulletin covers documents at different stages: new work, public enquiry, formal vote, publication, ratification and withdrawal. Those stages matter. A proposed standard is not equivalent to a published requirement, and a ratified document is not necessarily a substitute for checking the edition and applicability relevant to a project.

Industrial automation standards: the communication layer

One of the clearest automation-related updates concerns industrial communication networks. Several ratified UNE-EN IEC 61784-5 documents address installation profiles for fieldbus communication profile families CPF 2, CPF 6, CPF 8 and CPF 12. The documents focus on installation profiles, making them relevant to engineers responsible for implementing and documenting fieldbus networks.

For system integrators, the practical takeaway is to identify which communication profile applies to the equipment and network in scope, then verify the corresponding installation guidance. A standard’s publication or ratification does not, by itself, establish that a particular plant uses that profile. Network design records, device documentation and project specifications remain essential when assessing which documents apply.

Safety and electrical equipment developments

The bulletin also lists UNE-EN 50271:2019, covering electrical apparatus for detecting and measuring combustible gases, toxic gases or oxygen when software and/or digital technologies are used. Its scope makes it relevant to facilities that use gas-detection equipment as part of workplace monitoring or protective arrangements. Engineering teams can review the published document alongside equipment specifications and applicable site procedures, paying particular attention to whether the equipment falls within its stated scope.

Other published items touch on electrical and industrial systems more broadly. UNE-EN IEC 62485-4:2019 addresses safety requirements for batteries and battery installations, specifically valve-regulated sealed lead-acid batteries used in portable equipment. For automation projects involving such equipment, the standard is a prompt to confirm that battery-related design and installation requirements have been considered rather than treating batteries as incidental components.

Electromagnetic compatibility is another relevant area. A proposed IEC document listed in the bulletin addresses immunity testing for voltage dips, short interruptions and voltage variations for devices with input current up to 16 A per phase. Because it appears as a draft in the public-enquiry section, it should be treated as a proposal at that time—not as a published requirement. Nevertheless, EMC test developments can be worth tracking when specifying electrical or electronic equipment for environments where supply disturbances are a design consideration.

Distinguish published standards from proposals

The document’s status categories are important for compliance planning. Among the examples in the bulletin:

  • Published: UNE-EN 50271:2019 and UNE-EN IEC 62485-4:2019 appear in the national list of edited standards.
  • Ratified: The UNE-EN IEC 61784-5 installation-profile documents appear in the ratification section.
  • Proposed: A draft on test methods for losses and efficiency of converter-fed AC motors is listed among proposed work. Its inclusion signals development activity, not a finalized standard.
  • Withdrawn: UNE-EN 60534-2-3:1999, concerning flow capacity of industrial process control valves and test procedures, appears in the list of withdrawn standards.

For a plant using control valves, the withdrawal entry is a reason to check the standards register and applicable project documentation before relying on an older reference. The bulletin does not identify a replacement for that document, so teams should not infer one from the withdrawal notice alone.

What engineering and operations teams can do

A standards bulletin is most useful when converted into a controlled review process. Engineers, compliance teams and procurement stakeholders can:

  1. Filter for relevant equipment and systems. Focus on the technical committees and topics connected to the facility, such as industrial communications, electrical equipment, gas detection or process control.
  2. Confirm the document’s stage. Record whether a document is proposed, published, ratified or withdrawn before changing specifications or compliance records.
  3. Check editions and references. Compare the bulletin’s entry with the current standards catalogue and the specific edition cited in contracts, equipment documentation and internal procedures.
  4. Coordinate changes across project roles. Where a standard is applicable, involve design, integration, operations, maintenance and procurement teams so that requirements are reflected consistently.

This approach avoids two common errors: treating every draft as an immediate requirement, and overlooking a published or withdrawn document because its title appears outside a team’s usual area of responsibility.

Use standards tracking to guide practical reviews

The February 2019 bulletin offers a snapshot of standards activity at that time, not a statement of present-day requirements. Its automation-related entries highlight why ongoing standards management matters: fieldbus installation guidance, digital gas-detection equipment, electrical safety, EMC testing and process-control references can all affect technical decisions, but each must be evaluated in context.

For plant managers and technical decision-makers, the practical priority is to maintain traceable links between applicable standards, design specifications and installed equipment. Verify document status and edition before acting, and use standards changes to trigger a focused engineering review—not an automatic assumption that every update applies to every asset.

Access Official Technical PDF

About The Author