Effective ATEX gas detector installation involves more than mounting a sensor and connecting it to a controller. Detector location, hazardous-area requirements, cable design and commissioning practices all influence whether a gas detection system is ready to perform its intended role. Planning these details early also helps make inspection and maintenance safer and more practical.

Plan detector locations around the gas and the site

Start by identifying the target gas, potential leak points and likely airflow patterns. Gas density can help guide mounting height: position detectors for gases heavier than air approximately 30–50 cm above the floor, while detectors for lighter-than-air gases should generally be near the ceiling. For gases with a density close to air, breathing height is the suggested reference. These are starting points, not substitutes for considering site-specific airflow and leak scenarios.

Choose locations that technicians can reach for inspection, testing and calibration. Where access is difficult, provide maintenance platforms as needed. Protect detectors from mechanical damage, and avoid steam clouds and areas exposed to infrared radiation. A downward-facing sensor head supports correct operation and helps limit dirt accumulation. Weather protection is available for reducing the entry of dirt and water jets.

Installation timing matters too. Where project sequencing allows, fit detectors after other site work that could damage them, such as welding or painting, but before gases or liquids are introduced into the process. This approach helps reduce the chance that construction activity will affect the equipment before it is put into service.

Check hazardous-area and electrical requirements

Confirm the detector’s approval, protection concept and permitted installation zone against the requirements of the specific application. The detector models described in the installation guidance do not all have the same classification or wiring arrangement. For example, some models use three-wire connections, while others use two-wire connections. The equipment documentation and applicable site requirements should determine the correct selection and installation method.

Installation, servicing and use in explosive atmospheres should take account of the relevant standards, including EN 60079-0, EN 60079-14, EN 60079-17 and EN 60079-19, as well as EN 60079-29-1 and EN 60079-29-2 for gas detectors. Follow regional rules and site procedures. For ATEX-certified equipment covered by the manufacturer’s instructions, servicing is restricted to the manufacturer or maintenance personnel authorized by the manufacturer.

Before installing a detector or making electrical changes, disconnect power to reduce the risk of equipment damage and ignition. Do not make connections while circuits are live. Confirm that there is no risk of explosion before and during the work; the instructions call for checking the work environment with a portable gas detector of the appropriate Ex class before making connections. Incorrect wiring can damage the device.

Earth the detector casing using equipotential bonding. The specified minimum bonding conductor cross-section is 4 mm², with maximum bonding wire resistance of 1 Ω. Tighten the locking screw after closing the cover.

Design cabling for voltage drop and intrinsic safety

Gas detectors should be cabled to controllers as individual circuits, with cable selection made in accordance with EN 60079-14. Use armoured cable if the route is exposed to vandalism or mechanical stress. Ground signal cable shields at one end only to help prevent ground-current loops, while observing local regulations and standards.

Maximum cable length depends on the detector type, supply voltage and conductor cross-section. For longer runs, the cable-length calculation needs to account for the allowed voltage loss, detector current, wire area and the resistance of the cable material. The instructions identify 0.0172 Ω/m·mm² as the resistance factor for copper. In intrinsically safe circuits, the combined cable and detector capacitance and inductance must remain within the limits specified for the safety barrier.

Some configurations have additional constraints. The DGTec-ex, for example, requires a galvanic isolator or zener barrier, installed in a safe area as close to the detector as possible. The maximum cable length between this associated apparatus and the detector is 80 metres. Verify the barrier parameters and the detector’s specified intrinsic-safety values for the actual installation.

Allow for stabilization before testing

Do not assume that a newly installed detector is immediately ready for testing or normal operation. Stabilization time is generally two to four days or longer, depending on sensor type and site conditions, unless the model instructions specify otherwise. Bypass external alarms during this period so stabilization does not produce unintended alarm responses.

Model-specific requirements take precedence. For example, the ammonia sensor element in the DGTeex requires an uninterrupted 48-hour supply before testing or calibration. Even short power interruptions should be considered when meeting this requirement. Check the applicable detector documentation rather than applying a single startup period to every sensor technology.

Make testing and calibration part of the operating plan

Gas detection equipment requires regular maintenance. Calibrate detectors at least annually and test them more frequently according to the site’s security policy. Plan access for these activities when selecting detector locations, and establish suitable intervals as part of the site maintenance program.

Use calibration or test gas within the detector’s measurement range. For flammable gases, the stated concentration limit is 0–50% LEL; exceeding a detector’s range can damage its sensor. If an over-range exposure occurs, the detector must be tested and recalibrated. Also ensure that gas flow at the calibration cap is unobstructed.

Some models have additional recalibration triggers. The DGTi2-ex and DGTk2-ex instructions call for recalibration at least annually, after a shock such as a drop, or when site ambient pressure differs by more than ±5% from normal pressure. Other model-specific instructions may differ. Follow the requirements for the detector installed, and keep the calibration and inspection records supplied with the system.

Build readiness into the installation

A dependable hazardous-area gas detection system depends on matching detector location and wiring to the application, following Ex precautions, and allowing the sensor to stabilize before testing. Just as importantly, accessible placement and defined maintenance intervals make it easier to verify performance over time. Treat installation, commissioning and calibration as connected stages of one operating plan, and consult the applicable model documentation or authorized support whenever requirements are unclear.