Power assemblies bring semiconductor devices, cooling, mechanical clamping and supporting components together to meet the demands of a power-conversion system. For engineers and system integrators, selecting or specifying power assemblies involves more than choosing a thyristor or IGBT: the complete design must account for electrical operation, thermal conditions, mechanical stresses and the environment in which the equipment will run.

Dynex Semiconductor designs and manufactures high-power semiconductor modules and assemblies at its Lincoln, England, facility. Its work spans grid, renewable energy, industrial, transportation and specialist applications, with both standard products and assemblies tailored to customer requirements.

What power assemblies add to semiconductor components

A discrete semiconductor is only one part of a functioning power system. An assembly integrates devices with elements such as heatsinks, clamps, snubbers and gate drives, as required by the design. This can give project teams a solution configured around the application rather than a collection of components that must be independently selected and integrated.

Assembly performance depends on how those elements work together. Relevant design considerations include the semiconductor type, transient conditions, overloads, ambient temperature, heatsink surface finish and cooling method. Options described for standard assemblies include natural convection, forced-air and water-cooled designs. The appropriate configuration depends on the operating requirements and the intended installation.

Designing power assemblies for the application

Custom design starts with understanding the customer’s specification and operating needs. Engineering teams can then assess feasibility, select suitable semiconductor devices and develop a design for review. Depending on the project, that work may include 3D modelling and electrical, thermal or mechanical simulation before manufacture.

These analyses help examine different aspects of a design. Electrical modelling can support assessment of circuit behaviour, while thermal and computational fluid dynamics (CFD) simulations can help evaluate heat transfer and fluid flow. Mechanical analysis can address stress and displacement. Simulation does not replace validation, but it gives engineers tools to assess design choices before an assembly is built.

Device performance and packaging may also be tailored to the application. This is particularly relevant where the assembly must manage specific transient or environmental conditions, or where the customer requires a particular mechanical arrangement. In-house machining and engineering experience across device physics, electrical, electronic and mechanical disciplines support this design process.

Power assemblies across grid and industrial applications

Grid-linked conversion and power factor correction

Grid-linked converter systems can connect renewable sources such as solar, hydro and wind with existing power networks. Depending on the project and integration preference, equipment may range from cabinetised systems using a control platform regulated via Ethernet to semiconductor assemblies mounted with heatsinks.

Thyristor-controlled reactors (TCRs) are used with fixed or mechanically switched capacitors to provide static VAR compensation (SVC). By compensating for large loads with poor power factors, SVC equipment can improve mains-voltage quality. The source identifies electric arc furnaces in steel mills as an example application, including flicker reduction and power-factor compensation. Dynex describes water-cooled SVC valve assemblies designed primarily for operation at 35 kV, with a range extending up to 360 MVar. Its TCR designs include N+1 redundancy and matched thyristor modules intended to improve static and dynamic sharing.

Pulsed power and specialist switching

In pulsed-power systems, semiconductor switches can provide waveform shaping, pulse control and repeated operation for applications that might otherwise use thyratrons or ignitrons. Device selection is important to reliable operation, especially for high di/dt requirements. Thyristor assemblies may be used to connect stored energy to low-inductance loads or to provide crowbar protection that bypasses a load.

Rail traction upgrades

Traction power equipment can remain in service for decades, creating a need to assess ageing components and manage obsolescence. Support options described by Dynex include converter overhauls, reliability improvements, replacement semiconductor devices and re-traction projects, such as converting from GTO to IGBT technology. Assessing semiconductor condition and the availability of equivalent replacement parts can help inform upgrade planning.

Manufacturing control and assembly quality

Power assemblies can vary from higher-volume, less-complex products to lower-volume, highly complex builds. Process controls are important in either case, particularly when assemblies have demanding mechanical or electrical requirements. Dynex describes barcode scanning and data verification to trace subcomponents, along with recorded build and test results. Controlled assembly instructions, torque requirements and assembly sequences can support consistency across the manufacturing process.

Manufacturing support can also include subassembly preparation, dedicated assembly areas, mechanical handling, materials planning and packaging. These considerations matter for large or heavy assemblies and for products that require movement between manufacturing and test stages. The work may be supported by an in-house machine shop using conventional and CNC equipment.

Testing before equipment reaches the site

Testing helps verify that an assembly meets defined requirements and can identify issues before delivery. Standard end-of-line checks may include isolation testing, partial-discharge measurements and switching tests. Custom assemblies can require additional procedures, such as pressure testing and thermal heat-run testing.

Dynex’s on-site power testing facility is described as supporting tests up to 100 kV and 4 kA. Its liquid-cooling plant supports assemblies with flow rates up to 120 L/min, and the facility can conduct pressure and thermal tests. The specific test programme depends on the assembly and project specification; customers and engineering teams should establish acceptance requirements during the design process.

Practical considerations for project teams

When specifying a power assembly, engineering and procurement teams should align on key operating and integration requirements early. Useful discussion points include:

  • Electrical conditions: operating voltage, current, switching behaviour, transient conditions and overloads.
  • Thermal management: ambient temperature, heat-sink requirements and the intended cooling method.
  • Mechanical and environmental needs: mounting, clamping, handling and exposure to corrosive conditions.
  • Verification: required tests, acceptance criteria and the traceability information needed for the project.
  • Lifecycle planning: maintenance, replacement-device availability and potential obsolescence concerns.

These requirements help determine whether a standard assembly can be configured for the application or whether a bespoke design is appropriate.

Conclusion

Power assemblies are engineered systems, not simply semiconductor devices attached to a heatsink. Their suitability depends on matching electrical, thermal, mechanical and manufacturing considerations to the intended application, then verifying the result through appropriate testing. For automation and power-system decision-makers, involving assembly engineers early can clarify design choices, integration requirements and lifecycle needs before equipment moves into production.