For operators and maintenance teams sourcing work across borders, checking EASA Part-145 repair stations in the USA is an important part of supplier qualification. A directory listing can help identify an organisation and its registered facility, but the details must be read carefully: approval identifiers, FAA repair station numbers, site addresses, and continuation dates all relate to the specific entry.
These records are relevant to aviation maintenance rather than general industrial repair. For procurement, quality, and operations teams, the practical lesson is to use the listing as a verification aid and confirm current approval status and scope through authoritative records before assigning work.
What the directory records
The supplied directory presents organisations located in the United States alongside several identifying fields. These include an EASA approval number, an FAA repair station number, company name, street address, city, state, country, and a continuation date. Some entries also include an extension field, though it is blank in the supplied text.
The entries represent individual listed locations. The same company may appear more than once where it has multiple facilities. For example, the directory includes separate listings for several Honeywell, Boeing Distribution, Textron Aviation, and Chromalloy Gas Turbine locations. A company name alone is therefore not enough to identify the relevant facility.
How to read EASA Part-145 approval information
Match the approval to the facility
An EASA approval number is a key identifier for checking a listed organisation, while the FAA repair station number provides a separate identifier associated with the U.S. repair station. When reviewing a potential supplier, record both numbers exactly as shown and compare them with the applicable official records. Do not assume that an approval associated with one company site automatically applies to every location operated under the same corporate name.
Address details help distinguish between sites. Check the street, city, and state against the facility proposed to perform the work. The source text contains some incomplete or irregular address fields, including entries where a state is absent. Treat such cases as a prompt to verify the location rather than fill in missing information by assumption.
Understand continuation dates
The continuation date is a time-sensitive field, not a permanent statement of approval. Dates in the supplied directory vary by listing, and many shown dates fall in 2022, 2023, or 2024. Because the source is a dated snapshot and does not establish present-day status, those dates should not be treated as confirmation that an organisation remains approved now.
Before engaging a provider, check the current status in the relevant authority’s records. Confirm that the approval is valid for the planned maintenance activity and that the approved location is the one named in the work order or supplier documentation.
A practical supplier verification workflow
Maintenance, quality, and procurement teams can use a consistent review process to reduce the risk of selecting the wrong entity or site:
- Identify the exact work location. Capture the facility name and complete address, not just the parent company name.
- Record both identifiers. Note the EASA approval number and FAA repair station number as listed, then check them against current records.
- Review approval status and scope. Confirm that the approval is current and covers the work being contracted. A directory entry by itself does not describe the complete scope of authorised maintenance.
- Check dates and exceptions. Treat continuation dates as status indicators that require current confirmation. Investigate missing state, address, or extension details rather than inferring them.
- Keep evidence with supplier records. Retain the identifiers, facility details, verification date, and supporting approval documentation as part of the supplier qualification file.
This process is particularly useful when a large provider has multiple facilities or when a supplier record contains abbreviated company names. For instance, two entries bearing the same organisation name may refer to different cities and carry different approval numbers and continuation dates. Verification should be performed at the listing and facility level.
Limits of a directory listing
A directory is useful for finding and cross-referencing organisations, but it should not be used as the sole basis for a maintenance decision. The supplied list does not provide detailed approval scope, aircraft or component coverage, current operational status, or the conditions attached to each approval. It also includes formatting artifacts and truncated company names, which can make direct copying error-prone.
For this reason, treat the list as an initial reference. Confirm uncertain spellings and identifiers against authoritative records, and obtain the documentation needed to show that the specific provider and facility are eligible for the intended work. This distinction matters for compliance as well as practical coordination: an accurate company match is not the same as confirmation of the required maintenance capability.
Conclusion
Checking EASA Part-145 repair stations in the USA involves more than finding a familiar company name. Teams should match the EASA and FAA identifiers to the exact facility, validate the address, review the continuation date, and confirm current approval status and scope before work is placed. Used this way, a directory becomes a structured starting point for aviation maintenance supplier verification—not a substitute for current approval evidence.