Maricopa County air quality permit fees are an important planning consideration for industrial facilities, operations teams, and environmental compliance staff. The county’s 2025 schedule includes application charges, annual administrative fees, emissions-based fees, and separate costs for activities such as dust control, open burning, and asbestos work. Understanding which fee categories apply can help organizations prepare permit budgets and avoid overlooking related filing or operating charges.

Fees depend on the permit type, source category, activity, and—in some cases—the facility’s reported emissions or disturbed land area. The amounts below are from the 2025 schedule and should be matched to the applicable permit and activity.

Title V permit fees and annual charges

Title V application fees vary according to the requested permit action. A billable permit action is charged at $194.40 per hour. Fixed application fees include:

  • Minor permit revision: $150
  • New permit application: $7,000
  • Other significant permit revision: $1,000
  • Permit renewal: $3,500
  • Significant permit revision resulting from a major modification: $7,000

Title V facilities also pay annual administrative fees based on source category. Listed amounts include $26,670 for aerospace, $24,290 for combustion and boilers, $19,840 for compressor stations, and $21,550 for expandable foam. Other category fees include $26,410 for landfills and polymeric fabric coaters, $32,120 for paper mills, $37,560 for petroleum products terminal facilities, and $42,230 for semiconductor fabrication.

The schedule lists $19,840 for reinforced plastics, $24,780 for vitamin and pharmaceutical manufacturing, and $21,850 for wood furniture. Utilities using natural gas have a $13,820 base fee, with a $23,990 turbine fee where applicable. Utilities other than natural gas are listed at $51,060. The administrative fee for the “Other” category ranges from $26,400 to $32,130. In addition, Title V facilities reporting 2024 emissions are charged an annual emissions fee of $55.70 per ton.

Non-Title V and general permit costs

For non-Title V permits, a billable permit action is $194.40 per hour. New permits, non-minor revisions, and minor revisions each have a $200 application fee; permit renewal has no application fee in the schedule. Annual administrative fees depend on the applicable table: Table A is $7,150, Table B is $1,850, Table C or D is $730, Table E is $390, Table F is $9,490, Table G is $5,720, Table H is $9,490, and Table I is $5,720.

General permits combine the application and annual administrative fee. The listed charges are $1,010 for air curtain destructors; $1,500 for crematories and wastewater treatment plants; and $290 for fuel-burning operations. A $390 fee applies to asphalt kettles, dry cleaning, gasoline dispensing, graphic arts, stationary dust-generating operations, stationary emergency internal combustion engines, surface coating or abrasive blasting, vehicle and mobile equipment refinishing, and wood furniture, fixture, and millwork operations.

Dust control, burn permits, and related fees

Dust control permit fees are based on total disturbed surface area. Annual fees range from $570 for 0.1 to less than one acre, to $16,490 for 500 acres or more. The intermediate bands are $1,130 for one to less than 10 acres; $4,120 for 10 to less than 50; $6,870 for 50 to less than 100; and $10,310 for 100 to less than 500 acres. A block permit is $2,000.

Applicants may request accelerated dust control permit processing by paying twice the applicable fee. The schedule states that applications submitted with this accelerated fee will be processed by the end of the next business day. Dust control training costs $50 for basic training and $125 for comprehensive training. Off-site training is $35 per person for basic and $100 per person for comprehensive. Subcontractor registration is $50 annually.

Burn permit fees depend on the fire category and term. A 30-day air curtain destructor burn plan review and inspection costs $350. Land clearance costs $350 for five acres or more and $150 for less than five acres, each for a 30-day term. Other listed 30-day permits—including disease or pest prevention, fire hazard, indigenous scrub vegetation, and tumbleweeds—are generally $100, with fire hazard and tumbleweed fees charged per location. Ditch bank or fence row permits cost $100 per location for one year; firefighting instruction is $100 for one year, and watershed rehabilitation is $100 for 30 days.

Asbestos filings and miscellaneous charges

Renovation notification and plan review fees depend on the amount of regulated asbestos-containing material removed. The fee is $600 for 260–499 linear feet, 160–499 square feet, or 35–109 cubic feet. At 500 or more linear feet or square feet, or 110 or more cubic feet, the fee is $1,770. Demolition notification and plan review costs $600; annual operation and maintenance notification and plan review costs $1,250.

Other charges include a $100 Hearing Board filing fee, a $100 late fee when a notice of violation is issued for operating without a permit, and a $25 returned check fee. Maricopa County tanker truck certification vapor decals cost $280 annually, with replacement decals priced at $80. Delinquency fees are $50 or 5% of the amount due, whichever is greater, when payment is 30–59 days late; at 60 or more days, the fee is $100 or 10% of the amount due, whichever is greater. A conditional order fee is the applicable permit fee.

Applying the fee schedule to facility planning

For operations and engineering teams, the practical first step is to identify the facility’s permit type, source category, and regulated activities. Then distinguish one-time application or filing charges from recurring administrative and emissions fees. Dust-generating work, asbestos projects, burning activities, and contractor registration may bring separate costs that are not captured by the facility’s main permit fee.

Building these charges into project and annual compliance budgets can help avoid surprises during permitting and operations. Because the schedule assigns fees according to specific categories and thresholds, confirm the applicable classification and fee with the relevant Maricopa County Air Quality Department materials before submitting an application or planning regulated work.

Access Official Technical PDF