As wireless infrastructure expands to support 5G and connected devices, decisions about antenna siting, exposure measurement and public information can affect communities as well as network operators. New Hampshire’s 2020 Commission to Study the Environmental and Health Effects of Evolving 5G Technology examined these issues and issued recommendations relevant to anyone planning or managing wireless facilities. Its report also included a minority position, making it important to distinguish the commission’s majority recommendations from a unanimous conclusion.
Why the commission broadened its focus beyond 5G
Created under New Hampshire House Bill 522, the commission met 13 times between September 2019 and October 2020. Its remit concerned the environmental and health effects of evolving 5G technology, but members’ discussions expanded to include earlier wireless generations, radiofrequency (RF) emissions from multiple sources and the Internet of Things (IoT).
That broader perspective has practical relevance for industrial automation. A facility’s wireless environment may include communications infrastructure as well as devices such as Wi-Fi routers and connected equipment. The report argued that sources should be considered together; it did not provide a method for calculating a particular plant’s combined exposure or establish that a given installation presents a specific risk.
The commission heard presentations from experts in areas including physics, toxicology, epidemiology and public policy, as well as a telecommunications-industry representative. The report’s majority summary said it heard arguments on both sides and expressed concern about biological effects. Three members—Senator James Gray, David Juvet and Bethanne Cooley—filed a minority report disputing the majority’s assessment. They said the scientific consensus was that wireless devices and facilities operating within FCC exposure limits present no known adverse health risks. The commission’s filing, the report noted, should not be treated as adoption of a position by every member or the organizations they represented.
RF exposure monitoring and facility commissioning
For engineers and system integrators, one of the report’s most operationally specific proposals was Recommendation 5: measure signal strength at wireless facilities as part of commissioning, and repeat measurements when system changes could affect emissions. The majority proposed testing under worst-case conditions in areas occupied by or accessible to the public, using an independent contractor, with results made publicly available.
The recommendation also proposed a response if measurements exceeded applicable exposure thresholds: the municipality would be empowered to take the facility offline. The report acknowledged that theoretical calculations may indicate compliance for standard tower configurations, while arguing that buildings, terrain and beamforming could affect actual signal levels. Its proposed approach therefore emphasized field measurements rather than relying only on calculations.
Recommendation 6 went further, calling for new measurement protocols capable of characterizing signal properties and accounting for multiple sources. The majority argued that commonly used equipment did not assess these factors adequately and proposed wideband equipment. These were recommendations for further protocol development—not a description of an adopted statewide measurement standard.
For an automation or telecom project team, the practical takeaway is to make measurement requirements explicit in project planning where they apply. That can include identifying who performs testing, when it occurs, which operating conditions are assessed, how results are documented and whether local permitting requirements call for public reporting. The report does not specify a universal test procedure for industrial sites.
Siting, transparency and alternative connectivity
Several recommendations addressed how wireless infrastructure is located and communicated to the public. The majority proposed setbacks for new antennas, subject to municipal permitting and possible waivers, and labels on structures in public rights-of-way that hold 5G antennas. It also called for state information resources explaining RF radiation and ways the public could comment on exposure guidelines.
These proposals sit alongside the report’s discussion of federal and local authority. It noted that federal law restricts the use of health concerns as a basis for denying certain wireless facility siting decisions, while recommending that municipalities use their zoning authority within the applicable legal framework. Project teams should therefore distinguish between proposed policy changes and requirements already in force; the commission report itself does not establish new law.
For schools and public libraries, the majority recommended moving toward hard-wired or optical connections, including visible-light networking, over a five-year period once funding was available. It also supported broader deployment of fiber and internal wired connections. These proposals reflect the report’s preference for reducing reliance on RF links in some settings. They are not a blanket technical assessment of when wireless or wired networking is the better choice for a particular industrial application.
Research, environmental questions and decision-making
The majority called for independent research on health effects, clinical symptoms, exposure measurement and potential environmental effects. It also proposed collecting RF intensity data across New Hampshire and developing an updated exposure map. Other recommendations concerned warning signs, potential RF-free zones in public buildings and further examination of effects on wildlife and vegetation.
The minority report provides an essential qualification: its authors considered the evidence and existing FCC limits sufficient to support the safety of compliant wireless devices and infrastructure. The document therefore records disagreement over how to interpret the research and what policy response is justified. Readers should not mistake the majority’s precautionary recommendations for findings unanimously accepted by the commission.
What industrial decision-makers can take from the report
New Hampshire’s report is best read as a policy case study, not as a technical standard or a definitive resolution of the RF health debate. For industrial automation leaders, its most concrete contribution is the attention it gives to measurement, documentation, siting, public communication and the possibility of wired alternatives. These topics can be considered during wireless network design and facility planning without treating the report’s contested health conclusions as settled fact.
Where a project involves wireless facilities, teams can review applicable federal and local requirements, document relevant commissioning measurements and communicate clearly about what testing does—and does not—establish. The broader lesson is to integrate connectivity decisions with permitting, operations and stakeholder needs, while recognizing that the commission’s recommendations were not unanimously endorsed.