Access Official Technical PDF

Share Summary:LinkedInEmail

Solar energy can support electricity generation, water heating, pumping and other applications relevant to industrial facilities and communities. Experience in Malaysia and Morocco shows that expanding deployment involves more than selecting photovoltaic (PV) modules or solar thermal equipment. Policy, financing, technical expertise, local operating conditions and end-of-life planning all influence whether projects can be implemented and sustained.

The countries’ approaches differ. Morocco has pursued solar generation alongside solar water heating and other renewable resources, while Malaysia has seen growing interest in PV and faces a developing challenge around managing retired panels. For engineers, system integrators and energy decision-makers, these cases offer a useful view of the choices involved across a solar project’s lifecycle.

Solar energy in Morocco: generation and heat

Morocco’s solar resource supports both utility-scale generation and distributed applications. The reviewed studies report average incident solar radiation of approximately 4.7 to 5.6 kWh/m² per day, with sunshine hours varying from about 2,700 hours annually in the north to more than 3,500 in the south. These conditions have supported the use of PV for applications such as rural electrification, lighting and water pumping.

At a larger scale, Morocco has developed concentrated solar power (CSP) at the Ouarzazate solar complex. CSP uses collectors to convert solar radiation into thermal energy, which can then be used for electricity generation. The country’s development activities have also included PV and solar tower technologies. The combination matters: solar deployment is not a single technology choice, but a portfolio shaped by the required output and application.

Solar thermal systems are another important part of Morocco’s experience. Solar water heaters can supply domestic hot water, while research and development projects have examined collective hot-water systems and solar cooling. A national program launched in 2002, PROMASOL, sought to develop the solar water-heater market through quality improvement, certification, public awareness and installer training. These measures address practical conditions for adoption: equipment must be available, trusted and installed by people with appropriate skills.

Policy targets need implementation capacity

Morocco’s national energy strategy, launched in 2008, set an ambition for renewables to provide 42% of the energy mix by 2020, with solar, wind and hydropower each assigned an equal share in that target. This was a historical target, not a statement of current performance. Its relevance for project planning is that national ambitions need to be supported by investment, suitable policy frameworks, technical institutions and delivery capacity.

The reviewed work identifies financial barriers to solar deployment, including high initial costs and limited willingness to finance projects. It also points to the need for stronger incentives, research funding and pathways for translating laboratory work into commercial products. For project teams, the takeaway is to assess not only solar resource and equipment, but also the availability of financing, qualified installers, maintenance and supporting infrastructure.

Malaysia: PV deployment and end-of-life planning

Malaysia’s abundant sunshine has supported growing interest in solar PV. Deployment has been associated with mechanisms including feed-in tariffs, net energy metering and large-scale solar schemes. The paper reports cumulative installed PV capacity of 371.08 MW by mid-2018. This figure provides a historical snapshot of the sector’s development, rather than a measure of present-day capacity.

As PV installations accumulate, planning must also account for what happens when panels reach the end of their service life. The study focuses on crystalline-silicon modules, described as the dominant technology in Malaysia at the time. A typical module includes glass, polymer encapsulant and backsheet, an aluminium frame, silicon cells and electrical connections. Reported material shares include 76% glass, 10% polymer, 8% aluminium, 5% silicon and 1% copper, with smaller quantities of silver and other metals. These percentages are approximate and reflect the study’s characterization of a typical panel.

Much of a crystalline-silicon panel’s mass consists of glass, polymer and aluminium, materials that may be recyclable. However, recovering materials from modules requires suitable collection and processing arrangements. Smaller components can contain silicon, silver, copper, zinc, tin and lead, creating potential environmental concerns if panels are broken, handled or disposed of without appropriate controls. The paper notes that Malaysia did not then have a dedicated solar-panel recycling facility.

Waste classification depends on testing

Whether a panel is treated as hazardous or non-hazardous waste can depend on jurisdiction and test results. Leaching tests assess whether metals can migrate from broken module material into a liquid under specified conditions. The study describes test approaches used in the United States, Germany and Japan, which differ in factors such as sample size, solvent, agitation and test duration. Results are compared with the applicable limits to determine whether additional treatment is required before disposal.

For operators and project developers, this makes end-of-life planning a technical and regulatory issue, not simply a waste contractor decision. Procurement and asset-management plans should consider how panels will be collected, assessed and directed to recycling or suitable disposal when they are decommissioned. The paper also emphasizes that recycling can reduce waste and support recovery of materials, subject to the efficiency of the recycling process.

Practical considerations for solar projects

The two country cases point to several considerations that apply across industrial solar projects:

  • Match technology to the application. PV, CSP and solar thermal systems serve different requirements, from electricity generation to hot water and pumping.
  • Include local conditions in design. Solar resource, weather, dust and site infrastructure affect project planning and operation.
  • Account for implementation barriers. Financing, policy, skilled personnel and public awareness can shape deployment alongside technical feasibility.
  • Plan for the full lifecycle. Panel collection, material recovery, testing and disposal should be considered before large-scale deployment creates a waste-management burden.

Conclusion

Solar energy development in Malaysia and Morocco demonstrates the value of combining resource assessment with policy, technical capability and lifecycle management. Morocco’s experience spans utility-scale generation and solar water heating, while Malaysia’s PV growth highlights the importance of preparing for module retirement and responsible waste handling. For industrial decision-makers, the practical lesson is to treat solar as a complete energy-system investment: evaluate the application, establish the conditions for reliable implementation and plan for the equipment’s eventual end of life.

Access Official Technical PDF

About The Author