Solar microgrid procurement involves more than selecting photovoltaic panels and batteries. For public facilities, it can require coordinated planning across building design, financing, resilience goals, competitive bidding, contract review, construction, and commissioning. The Town of Atherton’s 2020 plans for its Town Center and Library complex offer a useful example of how these decisions can be sequenced when project costs exceed the available construction budget.

The Town initially envisioned rooftop and parking-canopy solar, together with a microgrid backup system, as additions to the new complex. After bids for the overall project came in significantly above budget, the Town revised the design to preserve the intent while deferring installation. The facilities were to be made “solar ready,” with basic supporting infrastructure included and the energy systems procured later.

Solar microgrid procurement starts with project priorities

A solar-ready approach separates building construction from the later procurement of generation and backup systems. In Atherton’s case, this allowed the Town Center project to proceed with infrastructure intended to support future solar and microgrid installations, rather than including the complete systems in the original construction contract.

The change also gave the Town an opportunity to examine a different delivery and financing route. The City Council directed staff to consider a Power Purchase Agreement (PPA), or a similar arrangement, under which a third-party provider could install the systems without an upfront payment from the Town. Under the approach being considered, payments would be made over time through a power purchase rate, with energy cost offsets factored into the financial picture.

The staff report noted that the Town, as a municipality, was not eligible for certain incentives available to private parties. A third-party provider might be able to access incentives and potentially reduce project costs. That possibility was a rationale for evaluating a PPA—not a guarantee of a particular price or savings outcome.

Define the microgrid’s purpose before issuing an RFP

A microgrid is a group of connected electrical loads and distributed energy resources that can operate connected to the wider grid or isolate from it. The ability to isolate can provide on-site backup power during grid outages. A solar-and-storage microgrid therefore needs to be planned around the facility’s operating needs, including which loads are critical and what resilience objectives the owner wants the system to meet.

For the Town Center, the proposed analysis was intended to clarify critical on-site loads, develop conceptual microgrid designs, and estimate costs for microgrid-specific equipment. Those findings could then inform the performance requirements and technical specifications in a request for proposals (RFP). The project team was also expected to review existing feasibility information and discuss targets for photovoltaic (PV) generation and battery energy storage systems (BESS) with Town staff.

This planning helps connect the system concept to the procurement documents. If the RFP does not clearly describe the facility’s needs and evaluation criteria, proposals may be difficult to compare on a consistent basis. A well-defined process can instead give decision-makers a structured way to assess provider qualifications, technical approaches, and financial proposals.

Use independent support to manage the provider selection process

In December 2019, the Council authorized staff to seek a consultant for procurement assistance. The RFP was released on December 20, and the Town received proposals from three firms. After reviewing submissions and interviewing the firms, staff recommended Sage Energy Consulting, working with the Clean Coalition, for a professional services agreement.

The proposed consultant role extended across the project lifecycle, rather than stopping when bids were received. The planned responsibilities included:

  • Helping prepare the RFP for a power services provider and establishing a schedule for procurement and project milestones.
  • Managing the RFP process, reviewing proposals and qualifications, and assisting staff and Council with evaluation and provider selection.
  • Reviewing project documents and supporting contract negotiations.
  • Providing oversight during installation and commissioning, then validating system performance.

For engineers and owners, the sequence matters: procurement specifications and contract terms establish what the provider is expected to deliver, while construction review and commissioning help determine whether the installed system aligns with those requirements. The Town’s plan explicitly included oversight through installation, commissioning, and performance validation.

Align technical, financial, and operational review

A PPA or similar third-party arrangement introduces financial and contractual considerations alongside system design. The Town’s consultant was expected to support both technical and procurement decisions, including proposal evaluation and review of project documents. The broader proposal described lifecycle financial analysis, utility tariff review, and consideration of storage or microgrid incentives as elements that can inform decision-making.

For facility owners, this illustrates why solar and storage proposals should not be assessed on equipment descriptions alone. The evaluation needs to account for the project’s stated goals, the proposed energy system, financing terms, operating and maintenance responsibilities, and the requirements for verifying performance. These elements should be reflected in the RFP, provider agreement, and commissioning process.

The agreement recommended by staff had a not-to-exceed amount of $134,700, including optional asset management services for five years at $9,700. Staff also requested an administrative contingency of $13,500 for unforeseen items. The report identified the Civic Center project account as the funding source and anticipated that installation and maintenance costs would be covered through a future power purchase rate. These figures related to procurement assistance; they were not the cost of installing the solar and microgrid systems.

Practical implications for facility owners

Atherton’s approach highlights several considerations for public agencies, campus operators, and other organizations planning distributed energy projects:

  • Preserve future options. Solar-ready infrastructure can keep a later installation possible when the full system does not fit the current construction budget.
  • Establish operating priorities. Identify critical loads and resilience objectives before translating a microgrid concept into procurement specifications.
  • Make proposals comparable. Define requirements and evaluation criteria so that provider offers can be reviewed consistently.
  • Carry oversight through delivery. Include project-document review, installation oversight, commissioning, and performance validation in the work plan.
  • Evaluate financing alongside engineering. Consider the proposed payment structure and operating responsibilities together with system requirements.

Solar microgrid procurement is most effective when facilities planning, technical requirements, financing, and delivery oversight are treated as connected parts of one process. Atherton’s plan shows how a project can retain its renewable-energy and backup-power objectives even when installation is deferred: prepare the site, clarify system needs, procure a provider through a structured process, and define how delivery and performance will be checked.