On-axis swap-out injection places demanding requirements on accelerator magnets and their pulse-power systems. In the ALS-U conceptual design, a stripline kicker would rapidly deflect an injected bunch train while minimizing disturbance to the stored beam. Prototype work in the ALS storage ring examined how to deliver that kick, manage beam-induced effects, and verify performance through modeling, bench measurements, and beam tests.

Why ALS-U called for on-axis swap-out injection

The ALS-U upgrade concept paired a new, low-emittance storage ring with a full-energy accumulator ring. The accumulator would allow bunch trains to be exchanged between rings using fast kicker magnets. This approach supports the stronger-focusing lattice and smaller beam apertures envisioned for the upgraded storage ring, while also enabling rounder beams and more flexibility in fill patterns.

For the storage-ring kicker, the stated design requirements included a 3.5 mrad bend, a total kicker length of 2 m across four modules, 6 mm electrode spacing, a rise and fall time no greater than 10 ns, and a 50 ns pulse. The ring’s bunch pattern, with short gaps between trains, made fast switching central to the injection scheme.

Why the stripline kicker suited the application

Ferrite-loaded kickers were considered too slow for the required timing unless divided into an impractically large number of separately driven sections. Stripline kickers offered a way to meet the fast-pulse requirement, but their design involves more than selecting electrodes and applying voltage. Impedance matching, feedthroughs, vacuum pumping, thermal management, and fabrication precision all affect the assembled system.

The ALS-U concept used four pairs of stripline electrodes in a single vacuum-chamber assembly. The preliminary design aimed for matched impedance and precise electrode positioning. Fenders were incorporated to reduce the mismatch between the structure’s even and odd electromagnetic modes. Because electrode position strongly affects characteristic impedance, mechanical alignment and measurement were essential parts of the RF design process.

A prototype based on ALS-U parameters was adapted for testing in the existing ALS ring. Its copper striplines were supported by Macor posts and connected through commercial high-voltage feedthroughs. A high-emissivity cupric-oxide coating was applied to the chamber and electrodes to help manage temperature rise from power coupled out of the beam.

Developing the pulser and verifying performance

The kicker’s pulser needed to produce bipolar pulses, with an adjustable pulse width and synchronized timing. The selected development approach used a solid-state inductive voltage adder (IVA) based on MOSFET switches. The design targets included a 50 ns flat top, approximately ±5.25 kV at the stripline, and a 5–95% rise time of 7 ns. Commercial pulser options were also evaluated as a backup, although proprietary designs can make maintenance and repair more difficult for operations staff.

Testing proceeded from models and cold hardware to operation with beam. Two- and three-dimensional simulations examined impedance, electromagnetic fields, peak electric fields, feedthrough behavior, and beam interaction. Time-domain reflectometry (TDR) and network-analyzer measurements helped assess impedance on kicker halves and after full assembly. TDR was also used alongside laser scans to identify and correct electrode-position errors.

In the ALS ring, initial checks found a clear beam aperture, no excessive heating in the chamber or feedthroughs under the tested conditions, and no higher-order modes in the kicker signals. Beam-deflection tests showed repeatable operation and an acceptable rise and flat top. However, the measured pulse fall time and a long pulse tail required further investigation. Later tests identified timing jitter and drift on the order of 200 ps, as well as low-level pre-pulses and reflections in some configurations.

Beam-induced heating became a design priority

Beam power coupled into the kicker depends on operating conditions, including bunch length. During testing, short bunches produced substantially more heating than bunches lengthened with a harmonic cavity. Under short-bunch conditions, an electrode deformed by about 2 mm, requiring the kicker to be removed and the electrode design improved. The incident highlighted why successful pulsed operation alone is not enough: the assembly must also withstand the beam’s ongoing RF power.

Development changes included thicker electrodes, improved processing and handling, expansion joints with greater travel, additional diagnostics, and interlocks. The team also investigated where beam-induced power was dissipated among electrodes, chamber, cables, feedthroughs, and termination loads. High-voltage, high-bandwidth terminations and an RF power interlock were among the continuing development needs.

Practical lessons for kicker development

The prototype effort demonstrated the value of treating the kicker, pulser, vacuum assembly, cabling, and terminations as one integrated system. Key engineering practices included:

  • Measure as well as model: Cold-model tests and TDR measurements exposed the effects of real feedthroughs, fabrication tolerances, and electrode alignment.
  • Plan for thermal effects: Beam-induced power must be characterized for relevant bunch conditions, then managed through electrode design, cooling or heat dissipation, and suitable terminations.
  • Include protection and diagnostics: Monitoring and interlocks can help detect excessive RF power before it causes component damage.
  • Test timing and reflections under beam: Rise time, fall time, pulse tails, timing stability, and reflections all influence the delivered kick and require system-level verification.

Conclusion

For ALS-U, stripline kickers and inductive voltage adders were enabling technologies for the proposed on-axis swap-out injection scheme. ALS beam tests provided practical evidence about pulse behavior, impedance, heating, and integration, while also identifying areas needing further work. The broader engineering lesson is that fast kicker performance depends on coordinated electromagnetic, mechanical, thermal, and controls design—not just the pulser waveform. Continued development focused on improving pulse edges, handling average beam-induced power, refining packaging, and establishing effective monitoring and interlocks.