Solar PV is moving from an incentive-led technology toward a cost-competitive source of electricity, according to the European Commission’s 2019 PV Status Report. For industrial automation engineers, plant managers and energy decision-makers, that shift raises practical questions: how should a facility assess the economics of on-site generation, and what operating and grid considerations belong in the evaluation?

The report describes a global industry expanding rapidly while manufacturers face price pressure and electricity systems adapt to more variable renewable generation. Its 2018 figures and 2019 outlook offer useful context for companies considering photovoltaic systems as part of their energy strategy.

Solar PV growth reshapes the energy market

Worldwide, newly installed solar PV capacity reached about 107 GW in 2018, bringing cumulative capacity to nearly 520 GW by year-end. The report estimates global solar-cell production at 114 GW for 2018, although published estimates varied because companies reported different measures, including production, sales and shipments. These figures describe related but distinct parts of the market: manufacturing output is not the same as installed capacity.

China had the largest installed base, with about 175 GW, or roughly 34% of worldwide capacity. The European Union had 117 GW, around 23%. Solar PV accounted for 39% of the new global power-generation capacity connected in 2018, illustrating how quickly the technology had become a significant source of new supply.

Manufacturing expanded alongside deployment. After production growth in China and Taiwan, capacity increased in other Asian countries, including India, Malaysia, Thailand, the Philippines and Vietnam. At the same time, manufacturing capacity exceeded what the market could absorb in parts of the value chain. Oversupply put pressure on prices and contributed to industry consolidation, including company closures and takeovers.

Solar PV costs: hardware is only part of the equation

Falling module prices have been a major factor in improving project economics. The report notes that, between the end of 2009 and the first half of 2019, the benchmark levelised cost of electricity (LCOE) from PV systems fell by 80% to USD 57/MWh. LCOE expresses the cost of electricity over a system’s lifetime, allowing comparison across generation technologies and project designs.

However, cheaper modules do not make every project equally economical. By 2019, modules represented less than 30% of the cost in the report’s benchmark PV system. Other factors—including operations and maintenance (O&M), permits, administration, fees, levies and financing—therefore carried greater weight in overall project economics.

Financing conditions are particularly important when assessing a project’s LCOE. The report links exceptionally low bids and power purchase agreement offers in some sun-rich regions to a combination of strong solar resources, high debt shares and low debt costs. These circumstances should not be treated as universal benchmarks: project economics depend on local conditions and financing.

What industrial energy teams should evaluate

For a plant considering PV, the report’s cost analysis points to a broader evaluation than module pricing or nameplate capacity. Decision-makers should examine the full project costs and how the system will operate within the facility’s energy arrangements. Relevant considerations include:

  • System design and operation: PV plant design and operating practices affect O&M costs, which form part of the system’s economics.
  • Financing: Debt costs and the project’s financing structure can influence LCOE, so assumptions should reflect the specific project.
  • Permitting and administration: These non-hardware costs represent a growing share as equipment costs decline.
  • Electricity use and timing: The cost of generation is not the full cost of delivering electricity where and when it is needed.
  • Storage and demand management: The report identifies storage, demand-side management and coordination with other renewable sources as parts of evolving electricity-system solutions.

For automation and operations teams, these points make energy planning a cross-functional task. Controls, facility operations, finance and utility-facing teams may all need to contribute to decisions about system operation, consumption patterns and grid arrangements. The report does not prescribe a particular plant-control design; it highlights that system economics and integration extend beyond the PV hardware itself.

Grid integration becomes more important as deployment grows

As PV supplies a larger share of electricity, integration with the wider grid becomes a more prominent issue. The report points to the need for new business models for collecting, selling and distributing PV electricity, including bidding pools, virtual power plants involving other renewable producers, and storage. It also identifies regulatory and legal arrangements that provide fair, reliable access to electricity markets and the grid.

Challenges differ by location. In regions with developed grid infrastructure, the focus increasingly includes integrating higher shares of PV into the electricity system. Where grids are weak or electricity access is limited, the report emphasizes decentralized renewable generation and planning that accounts for local energy resources and demand. In both cases, coordinating supply and demand is important to avoid investments that may not suit future system needs.

The same principle applies when evaluating industrial generation: a low generation cost alone does not resolve questions of connection, electricity use, storage or market participation. Those factors belong in the initial project assessment, alongside equipment and financing.

Practical implications for industrial decision-makers

The 2019 report portrays solar PV as a rapidly growing technology with substantially reduced generation costs, but also a sector navigating manufacturing oversupply and changing grid requirements. For industrial organizations, the practical takeaway is to assess the complete energy solution—not just panel prices. Project economics depend on financing, O&M and non-hardware costs, while integration depends on how generation fits with electricity demand, storage options and the grid.

As PV deployment expands, automation and energy teams can support better decisions by bringing operational requirements into project planning early. A lifecycle view of generation, costs and electricity-system integration provides a more useful basis for evaluating PV than equipment costs alone.

Access Official Technical PDF

About The Author